1,250 karma · joined February 16, 2011
Meanwhile there's massive amount of low-quality parts i have to wade through when wanting to order a replacement battery.
The developers do the same to me when they have the opportunity.
You're proving GP's point. Roads on their own don't make noise, but if I go outside I can hear the road noise from cars going down a IH-35 which is a mile away. (It isn't even the only road I can hear noise from)
How well the iPad / Apple Pencil work for drawing very much adds color to posts here berating the iPads for being a content consumption device.
Do you think its recording some other light?
' A Geomagnetic Disturbance Action has been issued as of 22:15 on 05.10.2024 to protect the power system from damage or disruptions due to increased geomagnetic activity.'
For ERCOT this is fixed as a hard requirement so there's no point in specifying the time-- it's all going to be the same. For example:
> Fast Frequency Response (FFR) – subset of RRS
> – Must be capable of sustaining its required response for at least 15 minutes (if necessary)
The setup you described there wasn't the situation I was describing at all.
I was describing a situation where there is utility power, a UPS, and a standby generator. When the utility power goes out, the generator has to start, stabilize, and only then can the load be transferred off the battery.
The requirement is that the UPS meet this current power demand for longer than the generator start up and transfer time (the "holdover time" I was speaking about in the previous post.)
For things like frequency response the holdover time is a fixed requirement. ERCOT requires all energy storage resources be able to maintain output for 15 minutes.
I don't care how long my UPS will actually last as long the holdover time is long enough to cover the time it takes to deal with all of the foreseeable problems in starting up the backup generator.
My website and it's content is what it is, and its not my job to make Google more valuable. They're a multi billion dollar company, if it's really a problem, they can figure it out.
Ensuring there isn't a single point of failure is not just as simple as 'putting it in the contract.' Carriers can and have groomed their primary and backup circuit on to the same L1 path without realizing it.
Trademark defense has nothing to do with this at the moment.
My point was gauge and maximum rated amperage are on the label.
The store brand, which is general most prominent, gauge is color coded: 6AWG - Gray / 12AWG - Yellow / 14AWG - Pink / 16AWG - Orange. There's one exception to this where 14 AWG cable is using orange labeling normally used on 16AWG wire but that's the opposite of a safety issue.
And they have generally have the rated amperage for the length of the cable.
One doesn't have a tomorrow without a yesterday.
(And you can do the same thing were you write the time to the RTC before you have the correct time)