And then Circuit 1 and Circuit 2 are taken down at the same time because even though they have diverse paths they're part of the same underlying DWDM system which has just encountered a fault.
Ensuring there isn't a single point of failure is not just as simple as 'putting it in the contract.' Carriers can and have groomed their primary and backup circuit on to the same L1 path without realizing it.