And it provides a method of price discrimination between people who care where they sit and those who don't.
A hidden charge would be if you had to pay for seat selection to sit anywhere at all and it wasn't included in the original price.
6,385 karma · joined November 7, 2011
Vancouver Island, Canada.
And it provides a method of price discrimination between people who care where they sit and those who don't.
A hidden charge would be if you had to pay for seat selection to sit anywhere at all and it wasn't included in the original price.
People who actually live in vans are far less common than people who take photos of themselves in vans.
Consumers shouldn't have to waste time sorting through products that are broken from day 1 in non-obvious ways.
There is a public interest in making /someone/ liable for defective products, as it provides a incentive for sellers to do due diligence on what they sell.
The party most able to root out sellers of defective or counterfeit goods is probably Amazon, but they currently have no incentive to do so as the liability is offloaded to judgement-proof Marketplace sellers.
Amazon's business innovation here is figuring out how to run a multi billion dollar retail business without product liability, and that's negative for society.
But since lives are at stake here, we prefer to have layers of protection rather than just one thing. Grounding jumpers can fail if not properly connected (a large mechanical force will be applied to the jumper when the phase-to-ground fault current flows through it).
Bottom line, respect the electrical code and connect generators through a transfer switch. These rules are in place for a reason.
I can't speak to non-electrical infrastructure, but the NERC CIP "high impact" standards already make it largely impossible to operate critical electrical infrastructure from anywhere other than a secured control centre. Operating from your laptop or iPhone from the kitchen table is however allowed for "low impact" assets like small power plants.
Using high-voltage unnecessarily to avoid using a DC converter is also not going to save money. Yeah, you can use a 300 V DC motor in a coffee grinder, but why? It's just going to cost more money to make.
A DC distribution system in the home would require both a high power rectifier at the main panel to something like 125 VDC, then many smaller DC/DC converters throughout the home for your usable voltages like 5/9/15/20 V that are too low to be effectively distributed.
All of those things would need to be maintained and upgraded over the years, because there is no such thing as power electronics that last forever. After a few electrician visits, you might find that you haven't saved any money at all.
Even if you have solar, you still need a DC converter because it will not output a constant voltage let alone all of the DC voltages you need for your devices. And generation any further away than your own rooftop is going to need to be stepped up to higher-than-home voltages and then back down for use in your home - all of which is exactly why we currently use AC for distribution.
A diesel locomotive's engine controls are about producing the right amount of power to match the operator's throttle control. Electrical frequency at the generator (alternator) terminals is irrelevant since that output is being rectified to DC anyways. This is great for a train, because it means you can have full power at any speed - the speed of your train and the speed of your engine are completely decoupled from each other. But if you now connect this normally variable frequency AC output directly to 60 Hz loads, you will need to figure out how to set the throttle to best maintain something close to 60 Hz and your power output will be limited.
The technical answer is that demand response resources are considered dispatchable or interruptible load. Load shedding is the dropping of "firm" or non-dispatchable load. Typically, load shedding due to energy inadequacy only occurs after all demand response resources have already been called in. It's not one or the other, it's always both in tandem.
The practical answer is that during extreme weather, there are never enough people willing to voluntarily freeze. The demand for heat when it's below freezing in a state where homes aren't insulated and people don't own winter clothing is relatively inelastic.
Furthermore, the retail energy providers offering these wholesale pricing schemes are just over-the-top resellers of energy, they don't own or operate any part of the electricity network. They can't instantaneously turn off anything.
Even your own health and well-being is not entirely you. Whatever you do to yourself has ripple effects on society. You go without health insurance, but when you fall ill or die prematurely, who takes care of your dependants?
Or more to the point, you sign up for Griddy and turn off your main breaker because the price went too high, then your pipes freeze and damage neighbouring properties or even worse, you freeze to death or die from carbon monoxide poisoning.
No man is truly an island.
But it seems that in the United States as long as the only thing you are harming is your own bank account you can take on as much risk as you want? I mean people are trading options on Robinhood with their last $500.
> Exacerbating and prolonging this sticker shock is a decision on Tuesday by the state’s Power Utility Commission, which regulates the nonprofit ERCOT’s operations. The order from the gubernatorially appointed PUC asserted that, even with a hike coinciding with cold weather and increased heating use, ERCOT had been undercharging consumers for the cost of energy and directed it to raise its rates.
Not really, ERCOT does not have anything to do with consumer energy rates, only the wholesale market. The vast majority of consumers buy energy through retail providers that in some way isolate them from spikes in wholesale pricing. A handful willingly decided to buy at spot prices through providers like Griddy, and they are feeling the consequences.
I don't know what to say, really. If you decide to play at being an electricity trader with your home energy bill, there is no way you are going to win in the long term.
You can't contract to buy a commodity at the spot price then ask to be bailed out when you end up on the wrong side of the trade.
There are also extremely broad misconceptions that Texas is somehow exempt from all federal regulation that are fueling people's motivated reasoning on this topic. NERC reliability standards are enforceable in Texas! [1] All existing and future NERC winterization rules apply just as much in Texas as anywhere else.
Yes, ERCOT messed up. Yes, there are big issues to be resolved here. Some of those issues are national in scope and some are Texas specific. But drawing a direct line from Texas being its own interconnection to this failure simply doesn't follow the facts for me.
In general, wind turbine foundations are considered to have a fixed lifespan of 25-30 years. If re-powering occurs at end of life, it may be with a larger turbine that requires a new foundation anyway, so not much thought is given to foundation re-use.