But I doubt we have the capital to buy them new.
107 karma · joined February 19, 2026
But I doubt we have the capital to buy them new.
We pay about $120 for the privilege, which takes 20 minutes of flying.
So I think even in this case the reserve capacity is "needed" (for the reserve requierement), but I can see them realistically being able to fly between the islands purely on electric power.
So if its in the way, they're backpedaling.
The way to solve it is to lift the bike's rear wheel and pedal like normal. That's it. No unbolting needed.
It's also great for getting on tall bikes at a standstill, since you can lock the pedal and use it to step up, you do need to quickly start cycling though.
Can anyone that has used ActiveRecord share their opinion?
They also love them on the mainland but nobody loves the hassle of getting one installed.
It's also insurance related. Houses are insured based on also their insulation. Try making a hole in that insulation for an a/c without 'gezeik' as we say.
When I lived there I had a portable mini split unit. I ran that baby constantly during heatwaves. Blew every single-hose portable AC unit away.
I applied cause the listing mentioned Python, and I was programming in Python at the time.
Once I started they were like yeah we put that there to reach a broader public but we use Ruby (on Rails).
So that's what I learned. I've just returned to Python via LLM's. I literally have not felt the need nor desire to use Python once I got used to writing Ruby.
Maybe a programming/assembly analogy can help you understand the issue.
In my case, ADHD makes my brain want to work in a parallel way.
While I'm busy with task A it's like HEY CONDSIDER TASK B. Did you see C?
On good days, we see that and say NO OP - BUSY WITH TASK A. And refocus our mind.
Say it's a bad day...
Instead of CONSIDER TASK B, it's more like GOTO TASK B. And here it's equally harmful.
What should happen is the registers (context) of the CPU (brain) should be saved when task A stops. Likewise before task B starts it should be fully loaded into the brain.
None of these things happen for us.
So task A is left in an unfinished state, the context to finish it dissolved into thin air. Task B is started without properly being prepared which negatively impacts efficiency and performance.
And the moment the going gets hard, dopamine release decreased, you can feel it coming...
INTTERUPT - GOTO TASK C.
So it's managing that that's hard. Writing things down helps a lot, but good luck remembering to write :D
I kid you not, that's literally the thing I've been considering all day, maybe it's a sign. So this is great confirmation.
Thanks for this!
And when we "break the rules" we consider the rules and break them in a way that minimizes our liability.
Like the reason for the certified install is to protect the line workers. I live on an island, so that's basically my neighbours. Nobody wants them dead. Likewise nobody wants to go through bureaucratic hell.
Solution: grid-backed installs that doesn't interact with the grid. Which any Juan or Pedro can do if you don't want to do it yourself. It runs around $200 to add a new "electric group" to your house.
And to be fair the standard rate is 0.38 cents per kWh and some fixed rate. But the poor they force on the pre-paid package which has no fixed rate, but runs at that higher rate.
And so when you can't afford to buy the electricity you end up in the dark without giving the utility any moral obligations.
I live in the "Caribbean Netherlands", the largest island of the 3.
We get Chinese solar panels here. $175 and produces 550 watt.
We then get Chinese MPTT inverters, always 2 if you run your fridge on it lol. $350 ish for one. The 5kW model. It's all one and the same.
You need a minimum of 3 panels.
So for less than $1000 you have 1.5 kWh with no storage.
Connecting the panels requires some care to ensure you stay within the parameters all GPTs know. Two pictures is all it takes. The spec label of your panel and that of your inverter.
I can't stress enough how easy it is.
The output of your inverter is 1 phase power. You can route that anywhere in your house safely since houses have.. circuits. So once the circuited is moved to the inverters grid, its seperated.. at the circuit breaker.
The scariest part was driving a screw through my roof.
There's 3 ways to run solar.
Grid tied, grid backed and off grid.
I live on a farm and am off grid. The solar inverter is my "utility". After the inverter I have my main breaker. The inverter makes 5 kW max at 230 volts, so my fuse is 5000/230 = 20 amps.
I'm outside the US, regulation is a suggestion here everyone ignores. So many many houses have solar panels here to offset grid costs ($0.60 per kWh).
The main way we do it is make it grid backed. This means the inverter creates power that is in no way mixed with grid power. It forms a microgrid within the home. All ac's are connected to this. This can be done in the electrical panel as its just rerouting wires to fuses.
So then you have your 20A fuse behind the inverter, and smaller fuses (which you should already have) to your house loads. Btw you guys run 110v so your fuses are probably double the rating of ours.
When you do grid backed a battery is nice, since it helps prevent using the grid when a cloud passes by, it forms a bit of buffer. A 5kWh battery already helps. At night the grid powers the loads.
Grid-tied is the one nobody here uses, so you can feed back to the grid. This involves complicated electrical stuff so you don't electrocute the line workers. Plus it gets complicated with split phases and such.
Not to mention utilities pay less than what they ask you for the same kWh.
In the case of balcony solar you can feed the inverter utility power and connect your AC to the inverter. It uses solar power first and takes the needed diff from utility.
How did you decide on 6 joins? And do the sizes of the to be joined tables matter?
My reasoning was this: my customers keep forgetting their password and somehow that becomes a trigger to contact me. No passwords, no problem.
I tried convincing them to use password managers but that was pointless.
But I see the pain and frustration so I will add passwords. And I quite liked the passkey idea, have to see how that works. Not that my customers would ever use it, but I would. It literally never occured to me.
Or does that work with diffusion too?
And yes I did see password4321's response. Been going through them since yesterday.
However I wasn't expecting this. I expected examples of contradictions.
God knows Christians these days are walking contradictions, so I understand your frustration and reaction, but I meant in the text.
I was watching a live worship session on Youtube and it was beautiful, kept my mind at peace.
Now mind you at the same time I was also a perfectionist, which means you tend to see imperfections in others.
Now at a certain point the singer's voice broke as she was hitting a high note. But before I could mentally register the imperfection I heard or felt such a clear gentle voice that said: "that was the most beautiful part".
In an instant it reframed the imperfect into perfect for that moment and thus forever.
And that's what your quote encompasses. Good read, thanks for sharing.
And I don't think it's as simple as you make it. So where I work we use amongst other things Rails. There are places in our codebase where using joins just isn't feasable cause the database would use too much memory and let's just say N is large.
But since we use Rails we can have it query the tables apart and join the tables through the defined model. We literally save like 20 seconds in some cases because 1 HUGE query becomes 8 straightforward ones with maximum index usage.
And because we have this capability in Rails we would never use something like this, cause that would neccesate us holding two mental models and have a clear "what do we run where" directive which honestly is a PTA.
Grid inertia is literally maintained by hundreds of thousands of pounds of metal spinning at 50 or 60 hz.
So as the grid moves towards solar and wind, it loses inertia. Solar has no inertia and wind is lightweight compared to baseload plants.
This makes the grid more sensitive to another that can cause the frequency to fall or rise, which will trigger automatic protections.
It takes longer to become an issue in large interconnected grids, but on islands it's like the leading cause of blackouts.
One badly timed cloud means problem, unless you can instantly replace the energy lost through other means.
With thermal power plants the inertia of the generator spinning gave utilities enough time to start up other generators. With solar and wind that's gone, hence the rise of grid batteries.
So then solar/wind costs should include ALL related costs, including grid batteries and such, and often it doesn't. And thus you get people who are against it for honestly a very good reason.
That said I love solar and run fully off grid, but I ain't deluded to think my island can go 100% green. Diesel will stay for now.
I do wonder if using solar to run huge heavy flywheels connected to generators can help with the interia issue.
To make electric energy I would have to make a small steam plant to run a turbine.