88 karma · joined January 3, 2021
Cranes - Likely on a barge, on a relatively narrow canal. That's quite precarious. And make that two for both sides (canal is impassable).
Heavy lift helicopters - Even the few multiple automated cranes capable of handling a ship this size take days to unload it. Also these helicopters are quite expensive to operate.
Floatation devices - See Costa Concordia salvage operations. Lots of consideration for structural stress. Lots of mounting points on the ship. Lots of actual engineering needed for the floatation devices themselves.
Also crew change is likely because of on-going investigations, and that will be tricky with the on-going mariner crunch. There's not a lot who are qualified to run a ULCV, especially one straight out of an accident.
And yeah I should have had server_name in my nginx config in the first place. This time I did some fun with multiple roots/domains on one server: one for unstoppable.com and the other for my actual website.