Which is an issue because re-starting a good-sized* rocket engine in 0g is non-trivial, and the penalty for failure tends to be "mission failed, vehicle lost".
*Meaning "large enough for major orbital maneuvers".
*Meaning "large enough for major orbital maneuvers".
For these onboard main engines, number of starts is not a concern.
Back when some geosynchronous satellites used solid motors there would be one huge maneuver at apogee to get nearly all the way to GEO (e.g. the Hughes/Boeing 376 spinners). The uncertainty in performance on these maneuvers was quite large so correction maneuvers were always planned afterwards.
On the other hand, neither one is guaranteed to be optimal for continuous thrust maneuvers, which with electric prop are increasingly common.