162 karma · joined April 12, 2020
- optimizing the placement of wind turbines to maximize energy capture
- determining the optimal size and type of solar panels for a given area.
Mathematical Tapas: Volume 1 and Vol. 2.
Many applications stem from a simple observation: if two activities must be performed consecutively then the time required to complete both is the sum of the individual times, but if they may be performed concurrently then the time required is the maximum of the individual times.
https://www.maths.manchester.ac.uk/research/expertise/tropic...
We would love to hear your ideas & suggestions! Thank you.
(hardware refers to to the lower API a layer uses, software are feedback loops of the layer)