550 karma · joined November 2, 2012
First, this is the DFM guide specifically for Seeed. Every factory will have a different set of specs depending on equipment (assembly, test, and inspection, and familiarity of operating personnel), throughout requirements, yield requirements and price points, rework allowance, and so on.
Second, these typically assume for wide tolerances. Operating environment or design may necessitate relaxing some parameters in order to allow others to tighten (aka the tolerance stack up).
Dealing with both cases effectively in volume production is what requires experience beyond the manufacturer provided DFM guide.
Someone who learns this guide inside and out will be able to DFM with Seeed but not necessarily anyone else.
More generally, the DFM guidelines for ceramic RF materials would be wildly different than for Kapton flex connectors or for standard FR4 material.
If Uber's thesis - that app-hailing will supplant car ownership - is correct, then car manufacturers have an incentive to either create their own hailing networks or partner with existing ones.
Even medications made in high volume processes have rejected units (and sometimes, batches). Process drifted, machine failed, raw ingredients had some issue.
A scientific paper at the very early stage is meant to show that something is possible if the conditions are just right. It may be actually outside the capability of the lab to document (or measure, or even know) every variable that makes up these conditions. One of the reasons there is such a chasm between lab and practice is that as people dive in for deeper review and productization, they find the process is too finicky, the applicability too narrow, etc. But the scientific paper is the first step in this process of discovery.
That said, it's critical that authors document whatever they do know or have control over. Electronic publishing, tools like Github, etc, all make the barrier for disclosure much lower.
(hi!)
The real problem is putting operations and verification in the same hat - public or private. Private transit systems work well when government regulators have the power to set and enforce a strict SLA. They fail without oversight. Same with public systems. When the operational and regulatory agency are the same, it becomes hard to penalize failures.
Not always. Many airlines (for example, American Airlines) will protect your connection even if you've purchased two separate tickets. And they'll do this across their entire OneWorld alliance of airlines, not just within the company. But unless you have added a frequent flier number, the airline needs multiple matching information (Name, DOB) to be able to make the link between your two reservations automatically. Otherwise, they would be unable to proactively rebook, hold the connecting plane, have someone meet you at the gate to rush you to the next gate, etc.