Lists, numbers, tabs, etc. are all a little time consuming... minor annoyance but thought I'd share.
My understanding is that East California is like that too. Not sure the status as of today and if this is still permitted or not? Look up some images from LA in the early oil boom - crazy.
Here's an example of them in Alberta (where I am familiar): https://maps.app.goo.gl/73x4uKZxWKbZkgD76
A typical "large" rig will need a 100m x 100m drill pad, roads to access which are often highly controlled during the design phase.
A drilling rig will remain on location for MAYBE 30-40 days if it is a deep well (2000m-7000m).
A completions rig (aka service rig) will come out afterwards to complete the well (install downhole equipment / frac / get the well ready for production). Lease may be a bit bigger if large frac. Been a drilling engineer for 15+ years so haven't really seen too many fracs.