2 karma · joined April 6, 2020
A different argument to the one presented in the article, you say. Huh.
I suppose I can't claim to know more about geothermal than the author of that blog post, but if you check again, you'll find it does mention EGS. Apparently something made the author decide the problems with Quaise using that are non-obvious enough to need explanation.
Enhanced geothermal involves fracking. Typical proposals involve creating crack paths between 2 nearby wells by fracking from both. It's been tested some but so far has not been economical.
Apart from the cost issues of enhanced geothermal so far, Quaise plans to drill deeper to higher temperatures to reduce power block costs. Sufficiently hot rock flows a little bit which makes fracking ineffective. Fracking also doesn't work as well with supercritical water. (If not drilling to rock hot enough to flow a little bit under high pressures, it would be much better to use conventional drilling techniques.)