Nintendo appears to make the musical elements of its work a priority and it's good to see it escaping the game console into live performance -- following in the footsteps of both show tunes and movie music..
1,007 karma · joined November 1, 2014
Nintendo appears to make the musical elements of its work a priority and it's good to see it escaping the game console into live performance -- following in the footsteps of both show tunes and movie music..
Changing the algorithm for the root is being studied - see for instance https://lists.icann.org/hyperkitty/list/ksk-rollover@icann.o... ; I wouldn't be surprised to see an algo change as part of the next root key rollover.
One potential problem with a pressure relief valve as a safety is that it could turn into a flare/blowtorch if there is an ignition source nearby, which constrains where it can be located (and requires ongoing maintenance to ensure vegetation/etc., doesn't build up where it could get torched).
And for fans of video game music: that song inspired this little bit from the 8-bit big band: https://www.youtube.com/watch?v=v6hJvSkVLXs
https://www.ntsb.gov/news/events/Pages/2019-PLD18MR003-BMG.a...
Unfortunately the shutdown of go.usa.gov broke a bunch of links from that page, but the NTSB recommendations are summarized starting on page 33 (PDF page 44) of https://www.ntsb.gov/investigations/AccidentReports/Reports/...
But the recommendations to the gas company included:
> Review and ensure that all records and documentation of your natural gas systems are traceable, reliable, and complete. (P-18-7) (Urgent)
> Apply management of change process to all changes to adequately identify system threats that could result in a common mode failure. (P-18-8) (Urgent)
> Develop and implement control procedures during modifications to gas mains to mitigate the risks identified during management of change operations. Gas main pressures should be continually monitored during these modifications and assets should be placed at critical locations to immediately shut down the system if abnormal operations are detected. (P-18-9) (Urgent)
Edit to add:
This page has currently working links to the specific recommendations:
"According to the NTSB's preliminary report, customers in the accident area received gas from a low-pressure (0.5 psi) distribution network which, in turn, was fed from a high-pressure (75 psi) main pipeline via regulators controlled by sensors measuring pressure in the low-pressure pipes. At the time of the accident, workers were replacing some of the low-pressure piping, but the procedure set out by Columbia Gas for doing this failed to include transfer of a regulator's pressure sensor from the old, disused piping to the new. As a result, when the old pipe was depressurized, the regulator sensed zero pressure on the low-pressure side and opened completely, feeding the main pipeline's full pressure into the local distribution network."
It's had a few propulsion system issues:
> On 9 September 2016, Intelsat announced that due to a malfunction in the LEROS-1c primary thruster, it would require more time for orbit rising ...
> In August 2017, another propulsion issue appeared, leading to larger-than-expected propellant usage to control the satellite attitude during the north/south station keeping maneuvers. This issue reduced the orbital life-time by about 3.5 years.
There was a disagreement between the Texas Commission on Environmental Quality and the US EPA about the specific type of permit that SpaceX needed from TCEQ for the deluge system but that was a paperwork/documentation issue only.
see:
The "mechazilla" launch tower has two "chopstick" arms which are used to pick up and stack both stages and which are intended to be able to catch the returning booster and maybe also the returning Starship upper stage.
Flight 4 was licensed on June 4th, was originally scheduled to launch on June 5th, and actually launched on the 6th.
Flight 3 received its license on March 13th and launched on March 14th.
Flight 2 received its license on November 15th 2023, and launched on November 18th.
Flight 1 received its license on April 14th; it launched on April 20th.
Down on the lowest level of the stage we find a small string orchestra, but then behind it on risers there are something like 18 oboes(!!), 10 bassoons, 9 horns, 9 trumpets.
Okay, that pretty much guarantees that somebody at the Goa Chronicle fell hook, line, and sinker for a bit of internet satire.
EDIT:
It would also appear that the good folks at the Goa Chronicle failed to check a Yiddish-English dictionary.
https://www.reuters.com/world/middle-east/pagers-drones-how-...
"Whatever founder mode consists of, it's pretty clear that it's going to break the principle that the CEO should engage with the company only via his or her direct reports."
Whatever happened to "Management by Wandering Around"? Usually credited to HP but Shakespeare had Henry V do it (see act 4 scene 1) and there are probably even earlier examples.
Note that the crawler-transporter doesn't hang around at the pad during the launch - after setting the mobile launcher down at the pad, it drives away back towards the VAB until it's needed next.
During the Apollo era, it also transported the Mobile Service Structure - a tower with work platforms that allowed access to much of the spacecraft on top of the rocket.
It is carried around by one of the two existing crawler-transporters, which moves it between the VAB where the rocket is built and the launch pad.
In the words of someone in the industry who tends to be on the laconic side:
"It is not as simple as a 'common connector'. There are different pressures, mixture ratios, comm gear, seat interfaces, etc. A requirement for commonality flows requirements upstream to the suit, seat and spacecraft. "
https://forum.nasaspaceflight.com/index.php?topic=60593.msg2...
On x86 in 64-bit mode, page table entries are 64 bits each; the lowest level in the hierarchy (L1) is a 4K page containing 512 64-bit of PTEs which in total map 2M of memory, which is not coincidentally the large page size.
The L1 page table pages are themselves found via a PTE in a L2 page table; one L2 page table page maps 512*2M = 1G of virtual address space, which is again, not coincidentally, the huge page size.
Large pages are mapped by a L2 PTE (sometimes called a PDE, "page directory entry") with a particular bit set indicating that the PTE points at the large page rather than a PTE page. The hardware page table walker just stops at that point.
And huge pages are similarly mapped by an L3 PTE with a bit set indicating that the L3 PTE is a huge page.
Shoehorning an intermediate size would complicate page table updates or walks or probably both.
Note that an OS can, of its own accord independent of hardware maintain allocations as a coarser granularity and sometimes get some savings out of this. For one historic example, the VAX had a tiny 512-byte page size; IIRC, BSD unix pretended it had a 1K page size and always updated PTEs in pairs.
Choices have to be made for usefulness vs completeness vs size as it's quite likely that at least one and perhaps multiple copies of the database are present on any system out there running code in C that needs to know what time it is in human terms.
But if you're a packrat, you can include the extras in your build of the timezone data by setting PACKRATDATA=backzone during the build.