Forgot about that until you mentioned it.
11,434 karma · joined March 24, 2008
Available for smaller projects (sub-80 hours), consulting, or to just shoot the breeze.
littlemachines@cedarlakeinstruments.com
Forgot about that until you mentioned it.
Does feel a bit eerie on moonless nights when the coyotes start howling though.
As for Reddit, there's a lot of "bury head in sand and problem will go away" behavior when it comes to AI. People are understandably worried about their jobs, but they're certainly not doing themselves any favors by downplaying AI or looking for "tech niches where AI isn't yet."
Copperhead is very interesting. I do some embedded systems consulting on the side, but I've never enjoyed PCB layout very much. I briefly investigated using AI for it the last time I had to do a board, but it wasn't very helpful.
And it's specific to just that type of device: anything else I've worked on that I can remember ATM, I know what they are used for.
I remember posting on PM about 15 years ago asking how to fix a mistake I kept making and he gently smacked me on the head and basically said just learn to do it right in the first place. Which was really the only good answer!
For quite a while, he hated having to test on real hardware because all sorts of failure modes that he couldn't predict: belts stretching, mechanisms hitting each other or not lining up properly and losing position, etc. kept happening and interfering with his nice "this will only take 15 minutes to test" estimates, making it an all-afternoon affair.
OTOH, it was that unpredictability and having to deal with weird stuff that I liked about programming embedded systems.
A Jira log is not part of a Quality Management System (QMS). An aircraft maintenance log is. If you fake data in the QMS, software or not, for a regulated industry, I can assure you that it won't be taken lightly by the regulators.
Try forging the software validation test records for that airplane's flight control system and see what happens.
Really have me wondering now.
I know someone who builds horse shelters that are larger than that, but a fraction of the cost, delivered. I've actually been thinking that if I wanted an outside office, I'd ask him to custom build one with the fourth wall closed (horse shelters are 3-sided) and I'd insulate and sheetrock it myself. IIRC he did our 10x30 one for about $2k, including delivery.
Around here, the cutoff for needing a permit for a "permanent structure" is 10'x12' which is a pretty good sized outside office.
Economics is what makes this country work. If converting to renewables makes more money, that's what will happen and the people making the money will find a way to justify it politically.
FWIW, I had an Indian co-worker who took peppermint oil frequently and said that it was very good for his upset stomach.