220 karma · joined June 18, 2023
50 years is a long time for a piece of machinery. There will be many failure modes that will be discovered in these planes.
The C-130 was thought to last forever. Until about 10 years ago, well used planes being used for firefighting starting having structural failure in flight. Suddenly, organizations flying the older airframes decided that it was no longer effective to take the risk of failure.
I expect Ada will capture 0.05% of the market for the next 100 years.
These 'measures' would be much more useful if they were used to determine the control limits of the software process being used.
'hours from pull request to merge' for an open source project is silly. who cares? 'number of commits a month'? who cares. what is the value of those commits.
why the focus on 'constant churn of software'? I don't see it.
Either you give up your IP (drawings and source code) or you are non-compliant.
Boeing got more value out of the defense part of McD.
engineers on the bottom don't care about the politics. they design and implement the best they can.
It doesn't mean you are a statesman, a scholar, or all knowing. About anything.
It also doesn't mean that you can solve every problem you encounter in life with that kind of behavour.
Tesla as a company is an impressive accomplishment. Elon does sound crazy, however.
(Hi Walter. Love your posts...)
relax! i am not saying Elon isn't the greatest engineer ever, and SpaceX is not a great company.
space flight is a dangerous business.
plug a good board on an extender. run a diagnostic that fails in a loop. using a scope, look at every pin on the connector. write down what you see. replace with a bad board. repeat.
which signals are different? chase them back. if the schematic does not match, get out a voltmeter and your eyes and draw a schematic that reflects how the board is wired.
he called this "good card - bad card".
and it worked. not going to make any claims about cost effectiveness, but we fixed every board. and my troubleshooting skills in digital electronics were greatly improved.
this was a 'fireman' kind of job. waiting for the system to break, so it didn't matter if 2 techs put a week into 1 circuit board.
Perhaps the knowledge of Starliner issues makes it more accurate to assess the risk.
Either vehicle could lose the crew on the return. "Astronauting" is a risky business.
I do not envy anyone on the decision chain.
so, changed wordsize, processor, operating system... minimal source code impact.
gnat needs money. well deserved. but adoption needs a free, easy to install compiler.
5 years ago i had the pleasure of resurrecting a dead system. it was about 30k of ada, lets call it ada 87 (!). unknown compiler, 32 bit, 68K processor, 16 MB memory, unknown OS.
code was compiling in 2 days, running in 2 weeks. i needed to change from using 32 bit floats to 64 bit floats (seems positional data is a little more accurate in 2020). 1 declaration in 1 package spec and a recompile, and all my positions are good.
i love that language!
once the maturity of the users advances to a sufficient point, then ada is the only solution.
"ada. used in creating reliable software since 1983"
when i first saw ada, i didn't understand the why. now i understand the why, but ada is effectively gone.
-- old fortran / C / Assembly programmer
Laundromats that hire an attendant, want to keep the attendant busy. "wash and fold" is how they do it.
for a family of 4 with towels and such, this would cost a fortune. a single person, it is a bargain. $25 to $30 a week.
in years past when i used to travel and be on customer sites for weeks at a time, i would get my laundry done before i went home. pick up the clean clothes on the way to the airport. eliminated one task when i got home.
The Novice test was something else. 20 questions. 5 WPM code. I was thrilled when it came in the mail. 40 Meter CW, look out.
Just ask him. He will tell you all about it.
neither is acceptable, one was attempting to usurp the transfer of power. the other, was to express anger with society.
You change the adhesive by issuing an Engineering Change Order. This is an engineering approval step.
In this situation, the specific adhesive probably was no longer available. Happens all the time.
When you buy an airplane, it is a 30 year relationship. The airlines listen.