I doubt that when technical drawing "versioning" predates CAD by decades, in the form of drawing release/review and configuration management (CM) groups that were highly organized by WW2. This was then implemented by packages like ENOVIA, SolidWorks PLM, which facilitate the review/signoff process to be paperless, but it is basically the same. This is completely different from the entertainment industry, which doesn't care about part compatibility, analyst reviews (stress, aerodynamics, weights, etc.), not to mention the nature of CAD data (rife with engineering metadata on assembly hierarchies, dimensions with tolerances, materials) being very different from the "looks good" graphics of entertainment/art.
I would agree its less impressive if everyone is forced to used the same CAD package. The video did not state whether or not that was the case.
Initial production of the A380 was troubled by delays
attributed to the 530 km (330 mi) of wiring in each
aircraft. Airbus cited as underlying causes the
complexity of the cabin wiring (98,000 wires and 40,000
connectors), its concurrent design and production, the
high degree of customisation for each airline, and
failures of configuration management and change control.
The German and Spanish Airbus facilities continued to use
CATIA version 4, while British and French sites migrated
to version 5. This caused overall configuration
management problems, at least in part because wiring
harnesses manufactured using aluminium rather than copper
conductors necessitated special design rules including
non-standard dimensions and bend radii; these were not
easily transferred between versions of the software
http://en.wikipedia.org/wiki/A380#Production_and_delivery_de...Nevertheless, CATIA is top-notch is used by many car, ship, aircraft and spacecraft manufactures.
Not sure what to think about that.
http://thedailywtf.com/Comments/The_Best-est_Version_Control...