The funniest has to be the engineering company which I used to work with (not for thank fuck) back in the 90's (when 100Gb was big data!). They managed to bag 2x full 42U racks full of HP N-Class HPUX UNIX kit, PDU systems and separate disk arrays for just over £1,000,000 supplied with one full time UNIX monkey to keep the plates spinning.
Turns out they had only 10 CAD/engineering staff and about 8Gb of data in an Oracle DB which a single Sun Ultra desktop (<£10,000) could have handled without a problem at the time.