I don't understand what problem you're worrying about though. Others have already brought up the data center example where Google often will leave a server rack in place for five years even if some of the individual computers in it have failed. That is, it's easy to replace an entire rack at once than to replace just parts.
Similarly, for a system like this, I would expect they would build in components, let's call them racks of panels, however many that are connected together. If one of these so-called racks fails, leave it up until whenever and then replace the whole thing.
Possibly you'd have to remove a bunch of panels from the canal if the support's collapsed, but you should be designing them for the highest possible wind roll, but so that's unlikely to happen. Well, earthquakes are a problem, and I'm not sure how much you can design for that, but once again, you design for that. In any case, if something happens in a disaster, well, you may have to remove some panels from the water, but that's a labor job that needs a little bit of safety training. But otherwise, no crane. You just remove it and throw it away. You come back with the cranes later to repair the system back to where it should be. I'd be thinking using a tow truck for disaster recovery, not a crane.