It is not just a small boiling water reactor. It is a 300 MW-electric boiling water reactor, and if successful, it will be followed by 3 more of the same type for a total of 1.2 GW-electric. That is more than an AP-1000 reactor, and much less risky.
Genuine question: Why? Why not many smaller reactors? Small modular reactors seem pretty neat.
Is there an efficiency loss/total cost difference with smaller reactors?
Meanwhile Sweden is putting its money where its mouth is:
https://www.rolls-royce.com/media/press-releases/2026/15-06-...
There are two South Korean plants (Kori, Hangul) larger than Bruce
Kori[1] has 7 operational units today and 1 commissioning and 1 under construction
Hansul[2] has 8 operational units and another 2 more under construction.
All 4 new units are APR-1400 reactors ~1400 MW capacity. Kori should retains its top position, Saeul-3 in Kori Phase II has already reached criticality in April.
Tianwan in China will come close but its 7/8 units are slightly behind in construction than Saeul-3/4 in South Korea, plus the plant is also bit smaller at 6600MW now . The Russian VVER-1200 design China are using is also slightly smaller than Korean APR-1400.