Ships (with long submerged pipes) would be prone to weather events and generally less reliable than an installed pipe. Perforation would be prone to clogging from build up so a nonstarter I would expect. Adding flex tubing and a relocation robot would be a maintenance headache as well. Not sure there is an easy optimization.