Carbon fouling is also a major block to scale. 15-20% of carbon deposits as soot on reactor walls. At a 1MW scale thats 15-30 kg/h of crud degrading the catalytic heat transfer. Continuous cleaning or scheduled downtime would drive OPEX out of possible realities.
Hot hydrogen loops are a son-of-a-bitch and equal continuous embrittlement of pipes, valves, pumps. Seals that work at temperature. H2 Leak detection. Some real heavyweight process safety engineering here.
The reactor chemistry is solved. The paper proves it works.
The scale-up is where clean-tech startups go to burn money and die.