This is not a feasible option due to the vast difference in crashworthiness standards between US freight rail and other system types such as light rail. The FRA actually prohibits allowing these two types on the same network of tracks at the same time. However, they could use a line along the right-of-way were it big enough to accommodate another set of tracks.