In this case, there is room for improvement, at some cost to be determined from a post mortem.
In this case, there is room for improvement, at some cost to be determined from a post mortem.
A bit of decentralization goes a long way.
https://www.gambit-energystorage.com/
https://www.angleton.tx.us/DocumentCenter/View/3793/Gambit-E...
https://www.ercot.com/files/docs/2024/01/12/Tesla%20BESS%20G...
They've been pushing the envelope on battery tech for some time now, and finding very useful, if at times novel, uses for it.
Hot take: Bring back JB Straubel (Former Tesla CTO). That’s who is the equivalent of BYD’s CEO. A driven, yet low key engineering leader. Culture comes from the top.
HN Search: BYD (sorted by date) - https://hn.algolia.com/?dateRange=all&page=0&prefix=false&qu...
Where's the value add in buying a Tesla battery instead of just getting one from one of their suppliers?
With that said, BYD has a strong offering and recently landed a large contract (12.5 GWh) in Saudi Arabia.
https://www.energy-storage.news/tesla-starts-production-at-s...
https://www.tesla.com/support/energy/tesla-software/autobidd...
https://www.pv-magazine.com/2025/02/17/byd-to-supply-12-5-gw...
With the switch to 21700 and 4680 batteries, they make their own (in China and I think some other US-based gigafactory)
The Chinese are far ahead of Tesla, specifically BYD
Tesla are not doomed (hyper inflated share price might be) but they have been over taken on all fronts
Elon still has the best rockets....
https://www.nrel.gov/grid/grid-forming-inverter-controls.htm...
It’s very weird, indeed
In fact that’s how individual sections of the grid set power flow limits, by ensuring they stop leading when they reach their max capacity. fascinating really
For example, you can't just turn on all the power plants. Ignoring the phase issue, power plants require some power to operate (which is where the flywheels and batteries come into play). This means you need to isolate them, and bring them up one-at-a-time (and you probably want to isolate consumers until the whole process is complete). How do you coordinate this in the absence of power/internet? Radios, but now you have to worry about the logistics surrounding that. Do you have a stockpile of petroleum that can be tapped without power, because your people aren't getting on-site in a reasonable time without a car. How familiar are people with the process, having never practiced it?
Black-start-region and join-regions should be enough to get a whole grid going?
Electric grid get more reliable with scale, not less (that's why parts of North Africa is interconnected with Europe, which itself is interconnected all the way to Russia).
Small grids (like islands) are always a nightmare to manage for that reason.
Had you read the Wikipedia page you posted, you'd have realized that they planned to use dedicated HVDC lines under the Mediterranean to carry the power, and not the Spain-Moroco interconnection.
But you need mountains and water. Chile has a lot of those