Edit: If the road deck is left in place permanently then it is a permanent elevated road deck built over a cut and cover tunnel. I can see how some people might consider this the "cover," but that is atypical in the industry and not what people are usually talking about when they say cut and cover. I'll concede that this approach sometimes happens, but I wouldn't call it "often" like GP does and I'd also note that even under this scheme the final surface/cover (e.g., the roadway) is completed after the underground excavation and structure are finished, meaning that the cut still precedes the cover.
The most common terms for this in the industry are "lid" or "cap." As in, you put the lid on, or cap, the excavation or cut and cover tunnel.