You can contrast what SpaceX has been delivering with Falcon and Starship vs what Boeing has been delivering with Starliner to get a tiny glimpse into how silly a claim it is that Musk is doing this to gift himself government contracts. Or compare how little the other billionaire-funded space company (Blue Origin) has delivered, even though they were actually founded before SpaceX. Musk doesn't need to (somehow) give his company a leg up via DOGE, his company is already the best provider available by a huge margin.
From there, the author says:
> consider the track record of Musk’s Boring Company, which is responsible for several of the worst municipal infrastructure boondoggles of the past few years.
In what sense is that true, even a tiny bit? TBC delivered the Las Vegas loop first phase for a cost of $31M per mile, which is significantly cheaper than what anyone else is digging tunnels for. A significant portion of that is station cost, which obviously becomes much less of the overall cost if you build longer tunnels. They completed this project in about 15 months. This was their first real project, before they had much opportunity to iterate on TBM designs (which if you look at the history of SpaceX, iteration speed is clearly a strong point in favor of Musk-led companies).
You can compare that to Cali's high speed rail project, which has a Phase 1 projected cost of $106.2B for 494 miles of track, which works out to $215M per mile, and that's not even a tunnel. They began in 2015 (before TBC was even incorporated) and there is not yet a single mile in operation.