Los Angeles has been doing this for decades - for years the largest single energy source for LAPW has been an 1800MW coal burning plant that they operated in Utah, which has very loose environmental regulations.
Los Angeles has been doing this for decades - for years the largest single energy source for LAPW has been an 1800MW coal burning plant that they operated in Utah, which has very loose environmental regulations.
> The Agency planned to build the third unit of 900 MW capacity. This unit was expected to go online in 2012; however, the project was cancelled after its major purchaser, the city of Los Angeles, decided to become coal-free by 2020. [0]
> The plant includes a HVDC converter. It is scheduled in 2025 for replacement with an 840 MW natural gas plant, designed to also burn "green hydrogen."[0] (released by the electrolysis of water, using renewably generated electricity)
[0] https://en.m.wikipedia.org/wiki/Intermountain_Power_Plant
[1] https://en.m.wikipedia.org/wiki/Los_Angeles_Department_of_Wa...
Hydrogen is a total joke of greenwashing (apart from some niche use cases) so I am not taking it into account
"Chevron joins Mitsubishi in 300 GWh hydrogen storage project as construction continues"
https://www.utilitydive.com/news/chevron-mitsubishi-hydrogen...
The ACES project aims to use electrolysis to produce up to 100 metric tons of hydrogen per day, which will be stored in naturally occurring salt caverns at the site. The caverns have a potential storage capacity of 300 GWh of energy, according to Mitsubishi Power, which is developing ACES jointly with now Chevron-owned Magnum Development.
For comparison, last year the largest battery system in the world was the Moss Landing project in California with 3 GWh of capacity:
https://www.energy-storage.news/moss-landing-worlds-biggest-...
The largest pumped hydro station in the US stores 24 GWh:
https://en.wikipedia.org/wiki/Bath_County_Pumped_Storage_Sta...
At 300 gigawatt hours this underground hydrogen storage system can store more energy than all utility scale batteries in the US combined.
From the article about the Chevron project:
> The project will initially provide fuel to the Intermountain Power Project, an 840-MW blended gas power plant also under construction in Delta, but Chevron believes there will be opportunities to supply hydrogen to the transportation and industrial sectors as well.
So even if the hydrogen storage facility was full, we're still limited to 840 MW of generation capacity. Sure, we get ~350 hours of runtime, but that's not really needed.
The Bath County Pumped Storage Station has 3003 MW of generation potential, with 11 hours of runtime from full.
Looks like the Moss Landing project is rated to be able to discharge 1/4 of its capacity per hour, so that 3 GWh facility can provide 750 MW. Batteries also have the advantage of being able to be sited much closer to the end user.