They likely wanted to just make sure that you hadn't done that. (And to do that, they had to send some fellows whose time was very expensive, because it takes long experience to build up an intuition for these things to the point that you're confident enough in your answer to not have to bother with the "measure everything and plug-and-chug the dynamics in a simulator" step.)
The former means that the assembly is assumed to meet UL specifications; the second means that it has been inspected by UL and confirmed that the assembly actually does meet specifications.
Making sure that things meet specifications is the entire point of the building department's inspections.
When I see situations like this, it's often because someone on the other side, or someone related, benefits from the arrangement. They would never admit so, but that's how things tend to turn out like that.