Does anyone know how the full width of the carriageway gets surfaced in this setup? Perhaps lane closures on the left/right side (sequentially) after the centre portion has been resurfaced?
In general the entire bridge is as maneuverable as a 230m structure can be. The individual segments are designed to articulate. So once it's set up you can move it around to any other patch of road surface in the area.