Replacing Wires Could Double How Much Electricity the US Grid Can Handle
cleantechnica.com
cleantechnica.com
It's common for people to look down upon NIMBY protests concerning stuff others would have to put up with.
"I, myself would totally welcome it, see" - never mind that the things that they scold others for not accepting, are things planned for nowhere near their backyard, so their openess conveniently wont be put to the test.
Most of the talk down of NIMBY protesting comes from such types, not from people local to the projects/changes that do welcome them.
# %%
%pip install -q pint ipytest pytest-cov
import ipytest
ipytest.autoconfig()
# %%
%%ipytest -v # --help
def test_pint_units_for_watt_meters():
import pint
ureg = pint.UnitRegistry()
unit1 = ureg.kilogram*(ureg.meter**2)*(ureg.seconds**-3)
unit2 = unit1 * ureg.meter
assert 1*unit1 == 1*ureg.watt
assert 1*unit2 == 1*ureg.watt*ureg.metersBut an interpretation would be volume which seems intuitive, double the length or area of a cylinder and you double its volume.
But, FWIU how this applies to line length and transmission time hadn't been tested until Veritasium's experimental video with CalTech with like a mile of cable: https://youtu.be/oI_X2cMHNe0
So, it doesn't need multiple length parameters.
People think you slap some solar panels on your roof and it's "problem solved". Apparently they have no idea how the world consumes energy, or the scale:
https://www.penguinrandomhouse.com/books/666342/how-the-worl...
In "Transportation", there are a lot of non-electric consumption (in US in 2022: 89.45% oil, 5.7% biomass, 4.69% NatGas, only 0.08% electricity, and other) because only few trains and individual cars are using electricity the rest like boats, planes, and most trains in US runs on oil.
So, yes it is good for electric vehicles to charge during the day when solar produces the most. But the vast majority of the electricity consumption (in US 99.9%) is from the Industry, Commercial and Residential while the transportation is only in US 0.1% (source: https://flowcharts.llnl.gov/sites/flowcharts/files/2023-10/U...).
Most of the Industry, Commercial and even Residential needs electricity at night, and storing that kind electric energy (48.57 Quads per year... that is 9,246,178,571 barrel of oil or 0.2 barrel of U235) is currently difficult.
In the extreme case, you can get solar power in the middle of local night and winter by way of building a perfectly reasonable (one ohm resistance) global power grid for a reasonable material cost (260 or so billion USD at current aluminium prices, more for actually putting it wherever).
You'd still want storage for e.g. electric cars, and we aren't that coordinated globally, so I doubt we'd actually build a global grid; but I can easily believe we will see a unified north american continental grid once Texas gets out of its own way, or a unified EU+friends grid, and even at that scale you get several hours variation in sunrise and sunset, climate, and how long winter nights are.
Big deal as in expensive? Grid as a whole, not the wire itself, that's the point.
I'm seeing headlines about the USA needing to spend ten times that to modernise their grid. It isn't unreasonable to suspect the USA's grid modernisation could, for a very small increase in material cost, turn it into part of something much grander.
Big deal as in a political PitA at every level? Yup.
Storing fresh water is a good idea anyway. You don’t want to run out of that stuff :)
"Let's just use solar" comments are tiresome. It's not a panacea.
Am I missing something?
Adding more conductive material helps with the resistive losses, but also makes the cable heavier. Using an advanced cable that has better tensile strength for the same or better conductivity accounts for those second order effects better than just adding more aluminum.
Are wires that heavy that the structure that holds them is always maxed out?
I assume that's 3 because 3 phase.
But the point is, each is a group of 4: https://en.wikipedia.org/wiki/Overhead_power_line#/media/Fil...
I think the question is: can towers holding single wires for each (phase?), support e.g. four like this?
On the same "holder", no, just due to how the wire is fastened to the poll. On the same poll, maybe, depends on how much poll real estate is available. Usually though there is not extra space available. High voltage conductors use the air gap as part of its insulation so to prevent arcing the conductors need to be spaced out so far apart.
Long story short, when you start to enter the kV range, your traditional rules of thumb go out the window. I have first hand experience with trying to keep a particle accelerator from arcing, and that was a nightmare ... I can't imagine mixing in high current as well.
Why build a tower that can hold like 2 tonnes of wire when it will only ever carry 1 ton for it's entire life?
The only entities that can make such long term investments are governments, via taxes, and not all governments at that. And such investment is usually reserved for either basic research or incentivizing production by mobilizing human capital (i.e the IRA in the US), not building excess capacity of questionable utility.
Whether it's worth it depends on interest rates, not on how long your investors live.
It's just that 50 years is a long time, so the savings from leaving the additional space would need to be quite big to be worth it today when discounted back.
In addition, you have lots of uncertainty: overbuilding the infrastructure in this way only takes care of exactly this one contingency, but there's plenty of other reasons why you might want to replace your pylons. Eg perhaps in 50 years we will have figured out how to send power without wires, or we will move to buried lines everywhere, or we will get our power as laser beams from orbital solar satellites, or we need new pylons in new places because settlement patterns have changed, etc.
We had near zero interest rates for years, but I didn't see any private investors making infrastructure investments that wouldn't possibly produce a return for 50 years.
> In addition, you have lots of uncertainty: overbuilding the infrastructure in this way only takes care of exactly this one contingency, but there's plenty of other reasons why you might want to replace your pylons.
Practically I think that's the real reason. Nobody has a crystal ball to to tell them what tech will be a good investment in 50 years. It's anyone's guess, and no interest rate will allow that kind of private investment.
We had short term near zero interest rates (and even below zero real interest rates), but that doesn't mean that long term interest were that low. See eg https://fred.stlouisfed.org/graph/?g=1jVdN or https://fred.stlouisfed.org/graph/?g=1jVe8 for the inflation adjusted one. Those are interest rates that the US government is paying on 30 year bonds. Private issuers typically pay more. (I picked 30 years, because that's the longest duration the US typically borrows at.)
> It's anyone's guess, and no interest rate will allow that kind of private investment.
If you can lock in a zero or negative interest rate now, it might still be a good investment.
In the real world, what lending entity is going to offer you financing at <= 0% for 30 years?
Just because 30 year Treasury yields fell below zero from 2020-2022 didn't mean I can get that kind of financing for a project.
You've summarily lost your mind if you think any sane utility CFO would greenlight deploying capex to the tune of billions in gross excess of requirements for the speculative option of expansion capacity at marginal cost several decades into the future. Also, good luck convincing rate payers that increased costs realized today is to speculatively reduce the utility company's cost of doing business long after they're dead.
But that's only useful, if you now need less of a safety margin than you thought you needed earlier.
Which is sometimes the case: when things are less well understood, properly conservative engineers add more of a safety margin. Compare how old manufactured things are often much heavier than newer designs.
See also eg how over time we managed to pack broadcast channels closer together in frequency space, because we got better at dealing with interference.
The 'magic ball' from the article is a good example of how more sensors (and better models) can help you be less conservative in your margin of error without sacrificing safety.
Or maybe all of their strength is used to hold themselves up and the load they carry is an inconsequential part.
From the ground they do appear that way, but I don't really know how much load the cables put on them.
I'd guess there are probably some areas where the towers are overbuilt by a useful margin. How good are the records and field measurements to get that evaluated would have to be considered.
Maybe with fiber transceivers, sure. But twisted pair is fine... Some of the 10G equipment doesn't go all the way down to 10M anymore, but just put your old 10M equipment on the 10/100/1G ports, and the 10G equipment on 10G ports. It can be on the same subnet, no big deal, as long as you're not running jumbo packets or at least only using jumbo with MTU discovery. (You can usually even run 10G on cat5e, as long as it's not too long, and not in dense conduit)
Weirdly, how utilities were financed blocks retrofits.
Public utilities make money by building new stuff. Increasing efficiency actually loses them revenue. Eventually, we have to reboot their businesses models. Meanwhile, we need legislation (and subsidies) to compel retrofits.
The problem is that the marginal utility gets smaller and smaller as the rollout continues. Most places in the US have some form of communication wire available, so you're not going from "nothing to fiber" but from "something slow to fiber" which is significantly different.
We used to do things like that, sure. Unfortunately, Government "Works" projects aren't like they were in the 30s-50s. Outside of rebuilding a few crappy bridges, almost nothing useful is being created.
At this point, don’t think we can trust the government with more money regardless of what they promise to do with it.
The vast majority of new Federal Gov jobs are build-nothing, do-nothing, buerocratic paper pushing roles that create nothing of lasting or even temporary value. The net effect of the massive Federal budget increases over the past ~4 years has been a sharp decrease in our overall workforce efficiency which has been the main driver of inflation.