A typical "large" rig will need a 100m x 100m drill pad, roads to access which are often highly controlled during the design phase.
A drilling rig will remain on location for MAYBE 30-40 days if it is a deep well (2000m-7000m).
A completions rig (aka service rig) will come out afterwards to complete the well (install downhole equipment / frac / get the well ready for production). Lease may be a bit bigger if large frac. Been a drilling engineer for 15+ years so haven't really seen too many fracs.
I can imagine in a big oil field like in Midland, TX they have a lot of sprawling operations that take up a lot of room. But that doesn’t have to be the only way.
"Every oil rig scrapes everything off five acres of land"
?
My understanding is that East California is like that too. Not sure the status as of today and if this is still permitted or not? Look up some images from LA in the early oil boom - crazy.
Here's an example of them in Alberta (where I am familiar): https://maps.app.goo.gl/73x4uKZxWKbZkgD76
Just an exaggeration of 100%, no big deal?
OTOH I cannot image how they want to do this with the conrete foundations of wind turbines. The newer ones are up to 300 meters high. With that leverage the foundations must be absolutely massive. I don't think they can ever be revmoved.
It's not a crazy claim; here's a NASA article on fracking wells being very visible from space at night. https://earthobservatory.nasa.gov/images/87725/shale-revolut...
https://www.nabors.com/for-contractors-ofs/rig-products/illu...
A lot of people in this thread are showing themselves to be people without any personal contact with oil exploration.