That's nothing.
A few years ago, I was working doing some of the engineering for a major alumina refinery upgrade in Australia. One of the major parts of an alumina refinery is what's called a calciner, which heats the produced alumina to drive off the chemically-bound water from the product. They're complex piece of plant with large ducts, blowers and cyclones all laid out with insulating material to protect against the high temperatures and erosive nature of the alumina.
We built our calciners in Thailand as entire modules - not merely the size of a bridge, but the size of a 6-story building, complete with all equipment, structure and wiring in place, and then shipped them to the refinery site in Australia. The largest of the modules was 1800+ tons.
Ah, found a picture: Here's one of our calciners about to be offloaded from the MV Sea Baron. The crawler crane at the very right of the picture gives a sense of scale.
http://www.outotec.com/pages/page.aspx?id=34948&epslangu...