Did Someone Order an Instant Bridge?
nytimes.com
nytimes.com
http://www.telegraph.co.uk/news/worldnews/asia/china/8602786...
For it to be more economical to build a bridge over in China, stick it on a boat, and then drop it in place 1000 miles from where it was originally made is telling of where the construction industry is headed.
I'm not sure I get your point.
However, our current spate of unemployment isn't due to China - otherwise things wouldn't have suddenly gone to hell in '08 but would have gotten slowly worse as China industrialized. The decline in real wages in the US might be due to competition for natural resources from China and India and Africa and South America, but generally I'm not going to complain about things going well in countries much poorer than my own.
Net result: global average wages settle somewhere near what a Pakistani brickmaker would call "prosperity". What you're describing isn't a win.
A few years ago, I was working doing some of the engineering for a major alumina refinery upgrade in Australia. One of the major parts of an alumina refinery is what's called a calciner, which heats the produced alumina to drive off the chemically-bound water from the product. They're complex piece of plant with large ducts, blowers and cyclones all laid out with insulating material to protect against the high temperatures and erosive nature of the alumina.
We built our calciners in Thailand as entire modules - not merely the size of a bridge, but the size of a 6-story building, complete with all equipment, structure and wiring in place, and then shipped them to the refinery site in Australia. The largest of the modules was 1800+ tons.
Ah, found a picture: Here's one of our calciners about to be offloaded from the MV Sea Baron. The crawler crane at the very right of the picture gives a sense of scale.
The Øresund (see http://en.wikipedia.org/wiki/%C3%98resund_Bridge) was built Lego style in Spain, shipped piecewise and assembled on site.
In Portland, ME, where I grew up there used to be this huge blue drydock in the harbor. Occasionally I would see whole Burke class destroyers[1] lifted up out of the water in it. The end of the Cold War meant that the navy was downsizing, though, and eventually it was decided that there were better uses for the place. It was sold to a city in Croatia, and they somehow put floats underneath and just sailed the whole thing across the Atlantic. Then they built a few oil rigs where it used to be, and sailed those down to Venezuela.
All this shipping of buildings back and forth...this clearly needs disruption!
http://www.wolframalpha.com/input/?i=distance+from+beijing+t...
And as far as putting it on a boat, sailing it across the pacific, through panama, and up the atlantic - or dropping it off in Long Beach, Oakland, Seattle, or Mexico and putting it on a train... well you do the math :)
Either way, that's a lot of diesel.
This is so true in programming as well. It's very easy to be consumed by the process and neglect the purpose and end-game.
Capture of government decisionmaking by suppliers (including external suppliers and government employees via their unions) is not so much a bug as it is a feature. (In the sense that it is not an undesirable accidental property of the system, it was the predictable desired results of actions taken by someone(s) with decisionmaking authority, not in the sense that it is socially desirable.)
My previous memory of a replaced bridge was the Charter Oak in Hartford, which was many years of parallel bridges in various states of (con/de)struction. Science!
In Bellevue, WA in 2008 a bridge across I-405 (at NE 8th) was constructed next to the old bridge, ANOTHER bridge constructed on the opposite side, the old bridge destroyed, and the first new bridge slid into place creating a new bridge twice as wide as the old original bridge.
Watch the video:
The bridge on the left used to be a two way bridge.
They could not construct the bridge right next to it since they would have had to close the original bridge (since it was so close to the new construction).
So the built it off to the side. Once it was built they opened it to traffic (temporarily) presumably to get a head start on converting the nearby roads to match the new traffic flow (which they would need to do anyway).
Then they slid it into place and the new traffic pattern is already set up. They actually could have left it off to the side but that wouldn't match the existing roads as well (too many turns).
It is great to see construction techniques benefiting from technology.
"It took just 51 hours to completely replace the Aberdeen Avenue Bridge over Highway 403 this weekend … 29 hours ahead of schedule! Using conventional methods, this remarkable feat would have taken up to two years to finish. Instead, using rapid bridge replacement (RBR) technology, removing the old structure and replacing it with the new bridge took only 2 days to complete."
http://www.morrisonhershfield.com/newsroom/Pages/AberdeenBri...
I don't think the reporter meant "secured" in the sense of preventing theft. Is a 400-ton bridge heavy enough not to rattle and damage the surrounding concrete if 18-wheelers repeatedly cross it at high speed? Or flip over if a train hits it from below?
I can't find the weight of that bridge directly, nor how they arrived at the value estimate, but if I'm reading it correctly, this (http://www.steelonthenet.com/commodity_prices.html) seems to say steel scrap was going for $428/ton in October 2011, so from the "estimated $100000" we can guess that it was about 234 tons of steel.
Also this, http://www.dailymail.co.uk/news/article-2050015/Brothers-cha...
> Two brothers have been charged with stealing a 'haunted' western Pennsylvania bridge and selling the 15.5 tons of scrap metal for £3,160.
(I assume being in Pennsylvania they actually got dollars for it)