Isn’t is simpler to pump the energy into a market pool connecting Morocco to the Iberian peninsula and connecting Britain to mainland Europe through the tunnel with France?
Creating a cable to power a place thousands of km away seems rather inefficient compared to connecting the power stations to a grid of cables which already exists.