I thought residential US service was 240V split phase with two 120V legs.
I've heard for some wet construction locations they'll set up 120V split phase with two 60V legs, to keep the potential to ground smaller.
I've heard for some wet construction locations they'll set up 120V split phase with two 60V legs, to keep the potential to ground smaller.