And if you have enough for peak demand (which France for a while mostly had), you run into the opposite problem of having too much power production when you don't need it. Nuclear reactors are not only slow to switch power output, but they cannot be run below a certain output level (like 40-50%) without shutting down entirely. On top of that, running nuclear reactors on average significantly below maximum output drives the cost up further.