There are very few places in Europe (outside of Norway/Sweden) where such long-term storage (sevel months worth) could be built at a competitive price. Currently, storage is usually counted in minutes to single digit hours, even in the optimistic plans.
So, barring some extreme breakthrough in storage technology, the only way to remove the reliance on fossil fuels, is to have significantly more plannable peak capacity than low season consumption.
In the case of nuclear, the main ways to bring prices down would be to create standardized and predictable regulations with a better thought out balance between the economic and health/safety costs, while also encouraging innovations and economies of scale to drive costs down in most other parts of the economy.
If costs could be reduced to €20-€40/MWh, some overcapacity would be ok.
This is not true
> On top of that, running nuclear reactors on average significantly below maximum output drives the cost up further.
It doesn't
Capable of changing power output at 3-5% of nameplate capacity per minute. https://www.oecd-nea.org/upload/docs/application/pdf/2021-12...
Again: This is a problem no country experienced so far, because even France doesn't have that much capacity.
That's more than fast enough. You could see it in the graphs in the document if you bothered to read it.
Note: renewables like wind and solar are orders of magnitude slower, intermittent, and actually require grid-scale storage
France has this problem in a hidden way: They have to import power in the summer, because they DONT have that peak capacity, nuclear or otherwise. To provide that with nuclear, they would either need storage or increase the number of their nuclear plants, and probably like 50%.
And that's true even assuming instant capacity adaptation. It's just not efficient to keep nuclear power at a capacity lower than their peak capacity.
You'd know if you read the link I provided.
Nuclear plants in Germany had no issues scaling up and down between 400-600MW and 1200-1400MW per reactor per day.
Now, with renewables you do have this issue. Because due to their intermittent nature you're required to both overbuild them and provide enough grid-scale storage to last for hours.
> It's just not efficient to keep nuclear power at a capacity lower than their peak capacity.
For some politically-motivated definition of efficient. Additional costs to running nuclear plants in load following mode are immaterial.