Yes. Here's the actual event, from the PJM dashboard. Note the times. The problem lasted less than 4 hours. Once they got past the early evening peak, things were OK. Times are EST.
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details.
Affected:
DR (Demand response hub)
AEP (American Electric Power)
COMED (Commonwealth Edison)
DOM (Dominion Energy)
DPL (Dayton Power and Light)
FE-ATSI (First Energy, American Transmission Systems)
FE-PN (First Energy, Pennsylvania)
Posting time: 12.23.2022 17:51
Start time: 12.23.2022 18:00
Cancellation time: 12.23.2022 21:30