> The two reactors at Torness have a combined electricity output of 1200 MW
If they bumped 1200 MW to 1210 MW they'd have the 1.21 GW they need to operate a Flux Capacitor.
If they bumped 1200 MW to 1210 MW they'd have the 1.21 GW they need to operate a Flux Capacitor.
No comments yet.