This article was published in 2017. The current status of Hinkley Point C: due for completion in 2026. The estimated cost (so far) is £23 billion. [1]
Hinkley Point C is an European pressurised reactor (EPR) design, the same design in use for:
- the Olkiluoto 3 power plant in Finland (due to start generating electricity in June 2022)
- Flamanville 3 in France (expected to be completed in 2023 at the earliest)
[1] Source for Hinkley Point: https://www.world-nuclear-news.org/Articles/Hinkley-Point-C-...