> MingYang says the MySE 16.0-242 is just the start of its "new 15MW+ offshore product platform," and that it's capable of operating installed to the sea floor or on a floating base.
Am I reading that right? A tower 242 meters tall (read: a 70-floor skyscraper), with moving 118 meter blades, and they're proposing anchoring it to a floating base!?