If that is correct, how were SpaceX and Scaled Composites able to do so much with such limited resources?
If that is correct, how were SpaceX and Scaled Composites able to do so much with such limited resources?
NASA could definitely be run better but let's compare apples to apples. I'm sure any given engineer at SpaceX has a computer on his desk superior to the entire world's computational capacity at the time the shuttle was designed.
People are not comparing SpaceX of today to NASA of 30 years ago.
They're comparing contemporary NASA to contemporary SpaceX and finding NASA is lacking.
They didn't have to include secret USAF, CIA, AAA etc requirements in the design.
They had a simple goal - get payload to LEO cheaply - not a nebulous goal of 'make America look good in space'
They did have to build components. Want to know why the shuttle (actually all space missions) took off in florida, were controlled in Alabama, and landed in California. Senators from Alabama, California, and Florida wrote their tender that way.
There is secret then there is ITAR. A lot of astromechanics, guidance and tracking is still under the control of the DOD. They'd have a hard time not going through them.
Goals, just like the, now, International Space Station have a ways of changing. The US thought they could build a permanently manned space station by themselves and even that proved too much.
Besides, you are incorrect: Atlantis just landed back in Florida, as did most of the shuttles. CA was just the backup landing site, and they often waited a day for weather in Florida to be good rather than land in CA to avoid the hassle of transporting the shuttle cross-country.
According to wikipedia, http://en.wikipedia.org/wiki/Shuttle_Landing_Facility, the runway was too good at its job and ended up breaking landing gear. So they spent 6 years sanding it down. But when I was a kid and asked why they landed all the way over there, someone at NASA told me it was the unpredictable Florida weather.