Why American construction costs are so high (2019)
pedestrianobservations.com
pedestrianobservations.com
Unfortunately, the ratchet effect for pricing means getting rid of mafia control doesn't necessarily undo the cost increases they dictated. Also, prevailing wage practices mean labor unions for the same trades that aren't themselves corrupt still end up with the same price inflation, at least regionally.
I think a bigger culprit is excessive local control and zoning restrictions, wielded to benefit property owners or to bleed developers and generate revenue for city governments. The shocking part, IMO, is that these costs far outweigh the cost added by notoriously strong French labor unions and EU regulation.
In France unions wouldn't attempt to get their people $200/hour that the sandhogs in NYC get. We should bring the high priced unions to a realistic wage. However most union wages are not that far out of line.
Also in France the union is more relaxed about letting go of jobs that are automated away. There is no reason a TBM needs twice as many people to operate it in NYC as in France. There is no reason for any trains to have a conductor anymore, and train drivers are something that should be all but dead as well (though France is way behind the automation curve here as well)
That said, union labor is only a small part of the problem. Even if all of the most anti-union propaganda is taken as 100% true, union labor is still only a small fraction of the total cost of any build in the US. As such we need to look hard at what is going on in the other parts of construction.
There’s a lot of on-the-clock non-work built into the work rules. My relatives in the industry described the typical day as involving on-the-clock time built in for cleanup&changing into/out of work clothes, briefing on tasks for the day, safety briefing (AM and again after lunch for legal reasons), smoke/coffee breaks, etc. The longest stretch of uninterrupted construction is about a 2 hour sprint into the end of the day.
On the staffing front, the only lever a project manager has is to give the 2-3 hardworking guys out of 12 a boatload of overtime hours to get the actual work done. This is one reason that on most every job site around the city you see some pretty sick cars. Those 2-3 guys are getting 50% of the work done out of the 12, and getting paid Google engineering money for it.
NYT article years back talked about 2nd avenue subway covered examples of work rules. Tunnel boring machine in NY requires 3-4x the staffing of Paris, because thats the contract negotiated in the 70s when it was seen to be reducing jobs.. and no one has revisited it. This is no small figure as we have a handful of these digging tunnels the last few years, at the rate of 50ft/day... for months. Similarly there is a mandatory on-site oiler who basically sits in the break room all day because the machines do not need constant oiling anymore the way they did when the rule was written half a century ago.
One example from my relative - on a large NYC project he worked, they couldn’t take deliveries from suppliers on Saturday because it required the job site to be opened. Per union rules this would have required some inane number of staff to be on-site getting overtime rather than just say the guy to open the gate & staff (if any) required to empty the truck.
A lot of this is because public sector unions are treated as a voting constituent rather than a vendor by the government, and no politician ever wants to cross them.
The result low numbers of heavily padded bids on contracts. And then execution tends to be inflexible and prone to bogging down.
There are only certain qualified bidders for projects that have attained a level of certification from the city. This reduces the pool of bidders, but it also just adds cost layers.
I have a relative that worked (briefly) at a firm that bids on city tech projects and then delegates all development implementation to tech subcontractors who then sub out most of it to offshore, with a few onshore dev&management.
The subcontractor can't bid because they don't have the scale to get the certifications, so the city pays a 40% margin to the certified contractor who is doing glorified project management.
I would be shocked if the same thing wasn't happening on the construction contracting/bidding process side of city/state/etc work.
This makes sense. My dad was an engineer working for the Feds. Really the job is technical project management and oversight. In the US there is a fetish for keeping the government workforce small. Which then results in outsourcing things at great expense.
Example I've heard that part of the reason there were delays and and cost overruns with the eastern span of the bay bridge was because CALTRANS didn't have enough engineers to do effective and timely oversight. Nor engineers with the proper experience.
The idea that US politicians never cross the public sector unions isn't compatible with the facts. The Taft-Hartley Act is law, and PATCO was destroyed.
The basic question is - do the work rules restrict employers from adapting to productivity enhancing technology changes over time? The goods&services in the US which go up in cost much faster than inflation are the areas where we are unable to harness labor saving productivity - education, medicine, and it would seem municipal capital construction projects.
Does your employer retain Fortran programmers on-staff in the break room because they signed a contract when Fortran was important? If your employer moved all your compute to the cloud, would you keep 100% of your now redundant datacenter staff onboard? Does your employer keep the underperforming 25% of the team perpetually and just grant paid overtime in the $100k+ to the superstars to cover the gap? Does your office building maintain an elevator operator in each cab despite having automated the elevator 50 years ago?
This is the difference between private firms and the public sector union stuff you deal with in places like NYC.
I mean yeah, it sounds like a pretty nice work environment and I'd love if my (easier/safer) office job had all that paid time, rules and work limits built in. However.. I get why it seems nothing gets done in NYC construction because of it?
A fun example - there was a 6 month project to replace a set of 2-story staircase at my subway station. The demolition work was rather swift. I assumed they were building on-site if it was going to take 6 months. Lo and behold, it was actually a pre-fab staircase they trucked in. However not only did it take 6 months to simply install that pre-fab staircase, but they ran over by a few months! They actually had to come back and re-close it and do some repairs afterwards too. Meanwhile at the corner below that train station there was a McDonalds. I laughed as I watched them gut renovate it over the course of a weekend so they could be back in business by Monday selling food to riders.
If you haven't seen NYC municipal construction up close, its hard to fathom just how screwed up it is.
None of the rest of your reply is actually a response to what I said, though some of it is interesting. You also notably didn't respond to what I said about politicians.
Regarding Fortran programmers' contracts being honored, I would certainly hope any business would meet its contractual obligations (when they are moral and legal). Surely you aren't actually suggesting they shouldn't? Whether signing such a contract was a good idea or not, the very concept of a contract is founded on actually executing the terms of the agreement afterward.
I have never encountered a business that consistently swiftly dropped the underperforming parts of the team. I know that stack ranking firms supposedly exist, but they are far from typical. Even if your employment history is atypical, surely you've encountered less than efficient employees at clients, at vendors, and just out in the world in retail or restaurants; have you never happened to observe some of them staying in those positions at length? If you have seen private enterprise up close, it's hard to fathom the idea that it runs lean operations without waste.
Furthermore, many businesses have employees, sometimes many of them, who don't have the kind of clear work products that would make "the underperforming 25% of the team" potentially conceptually coherent. Plenty have employees with as little to do as a TBM oiler or an elevator operator. The market isn't just taking its time in pushing them to be more efficient, either. Actual markets and actual managers don't work like in an entry-level economics class.
Therefore the only way project managers can get anything done is to give 25% of the team the opportunity to work 2x the hours for 2.5-3x the pay.
So instead of paying just for your 12 guys, you are paying for equivalent of 9+(3x3) = 18 guys when its really like 6-9 guys worth of work getting done.
There was a great piece done by John Stossel about why a pretty basic public park bathroom cost $2M to build and took years to finish construction. https://www.youtube.com/watch?v=qKRuhiMDOjo
On my street, the city(near Denver) recently added 3 curb cuts for ADA compliance. I don't know how much those curb cuts cost, but they weren't free. Now - no one really walks down my street. There were curb cuts at both ends of the block. Every driveway has a curb cut. But more curb cuts needed to be added because of the ADA, even though there is no clear explanation of how anyone with a movement disability is going to benefit from these new cuts.
Does a parent with their kids in a stroller get discouraged by this? How about those with Rollerblades, non-electric scooters, or any kind of dolly?
Curb cuts for cars are often a notable detour for other road users, many have a 1/2 inch lip (unlike sidewalk curb cuts).
> Do you ever question why the sidewalk was unused?
No, because it is clear. It is unused because the only reason anyone would walk down it is if they lived in the neighborhood. So people do use it, but the number of unique users is approximately how many people live in the 10 houses on the street.
> Without curb cuts
There are a ton of curb cuts. Literally every 70' is a curb cut for the entire length of the street before they did their work. Now there are three more curb cuts.
> Does a parent with their kids in a stroller get discouraged by this?
I'm a parent with a stroller and it has never been a problem. Hasn't been a problem for my wife either who is significantly weaker than me and has a bad back.
> How about those with Rollerblades, non-electric scooters, or any kind of dolly?
These are also me, and no, no problem. Also me on a skateboard without an issue. And it's not because I'm great at skateboarding, since I literally just started 2 months ago.
> Curb cuts for cars are often a notable detour for other road users
There's zero lip on any of the 12 curb cuts on the street. I know this because I've ridden my skateboard over them a bunch of times and have never fallen.
This poor connectivity is part of why states and localities have banned cul-de-sacs and started enforcing road end connection ordinances. Here in Seattle there are many dead end roads that have a staircase down to the next road (usually a 2 story drop) to tie our hilly city's sidewalks together.
Here is a pdf the report: https://www.ceic.gouv.qc.ca/fileadmin/Fichiers_client/centre...
There is a cost difference between all union projects, and non-union projects.
The costs seem outrageous at first. If I wanted to hire a union local 6 Electican a few years ago the union would charge me $101/hr. for a skilled worker to show up.
Yes--it sounds nutty?
The answer is bypass the union, and go non-union?
When all us said and done, and the project is completed, and the developer gets the bill; the few projects I worked on, the total cost of building was roughly the same?
That doesn't take into account what non-union shops cost society either.
Very few non-union shops provide health care. If they do, it's usually a lousy plan.
Workers get sick, or hurt, and worker's compensation runs out; you have workers looking for government medical care.
My point is I'm pretty sure the mob is not affiliated with unions in San Francisco. (I know that was not your point)
My main point is when the building is completed, and it's time for the developer to sell the shiny new building; the price you pay is exactly the same.
Non-union workers make developers more money. The buyer will not see those savings.
You the buyer will not receive a better deal ever. The market determines the price.
Now--if you are the developer, it's a no brainer--kind of--you want the building built as cheaply as possible. You hire non-union, provide lousy training, but live in a grand mansion. You spit out a few spoiled kids, and they run the money machine. (Big Bill of Bradley electric was apprentice for 5 years. Learned the trade. Turned around and opened a non-union shop. Made millions. Made so much money he could shoot his son in-law, and somehow get out if a long jail sentence. Making a lot of money is nice?)
Many unions now have a no compete clause in their agreement. Unions don't want to pay for your schooling, and have their guys opening up non-union shops. I am pretty sure it's never enforced, or even legal? Wow--I'm just writing too much today. Don't feel that great? I'm finding this opening depressing in a weird way. Sorry about bothering anyone with my issues. I sometimes have no one to talk to.)
O.k, I say "kind of" because with a union run job, it's usually done on time, and done well.
This crazy rant is basically developers are usually the only one's saving money with non-union help.
This is why owners of Class A real estate usually mandate union labor, at least for MEP trades.
I bid and run work at a union shop, it’s sometimes difficult to compete on prevailing wage/public jobs here since only the cash wage portion is counted and not the benefits portion. So, a non-union shop can pay the $45/hr prevailing wage and cheap out on fringe benefits, maybe an additional 12-15/hr, where the union labor gets the prevailing wage and negotiated fringe benefits package that is roughly 2x the base wage (total comp). Right now we pay union journeyman electricians $87/hr in IBEW 292, which will go to $90/hr next Monday.
The good thing is, there’s plenty of work for union shops since as I mentioned, lots of Class A real estate and giant companies stick to union labor for construction, as the quality or perceived quality is higher (in general).
You’re also correct about the extra savings going to the developer, if you hire non-union labor and are bidding against a union shop and it’s a lump sum bid, you only need to beat the union guy by 1-2%, the rest is profit to keep.
It’s refreshing to see someone with actual experience commenting about construction on HN, nice post!
It is more complicated than that.
The way that supply and demand works, is that if costs go up, then there is less reason to create new supply.
And a lower supply of an item, means that prices, for the overall market, will go up.
That is how supply and demand works, and housing is no different.
> You the buyer will not receive a better deal ever. The market determines the price.
The market is determined by supply and demand. This is standard, 101 economic theory. If costs go up, supply go down (or supply increases a smaller amount), and price goes up.
The feds know it’s corrupt. Why can’t they go there and say all projects need to come through us and they ensure there is no monkey business going on with the contracts?
Yes, construction contracts and rates are fueled by corruption. That said, I would only be OK with the feds going after the corruption. Not taking over construction. Do investigations. Trap people in stings. Do all the good old FBI tricks. I encourage that, but governmental takeover of all contracting is going too far.
Though as I said elsewhere, that just means in a few years the corrupt switch to how to deal with the feds. Much better for the feds to be an independent anti-corruption unit.
Ha! When I read that line I completely missed the last letter in the word "organized", and it made perfect sense. I thought it was an historical quote from Guiliani's last job application.
Chinese dynasties did similar with their civil servants and Soviets practiced this in some areas to avoid this coziness that leads to corruption.
The corruption stayed the same - it's a revenue center, why touch it.
Why American Construction Costs Are So High - https://news.ycombinator.com/item?id=19313042 - March 2019 (158 comments)
Why US Major Infrastructure Construction Costs Are So High - https://news.ycombinator.com/item?id=19308481 - March 2019 (2 comments)
An adjacent one for good measure:
Why Are Canadian Construction Costs So High? (2018) - https://news.ycombinator.com/item?id=21618134 - Nov 2019 (140 comments)
Alon has continued their work on this subject with a team of other scholars as the "Transit Costs Project": https://transitcosts.com/about/
They have all said that you need to deal with the wiseguys. They also have told me that they are nothing like what TV makes them out to be.
Sort of like the famous "widgets" scene in Back to School[0].
I can tell you that the Japanese (at least in Tokyo) construction industry is awesome. They build incredibly ambitous and robust buildings, in a really short time.
I traveled to Tokyo regularly, for 20+ years. I tended to stay in the same hotel.
I remember looking out my window one year, and seeing a big field.
The next year, it was a big hole in the ground.
The next year, it was a 30-story skyscraper; fully occupied.
Nobody cares if cars are “built to last” 30+ years, because we can just make new cars. There’s a persistent mythology in construction about “they don’t make ‘em like they used too” and “back in the day they were true craftsmen”.
It’s mostly BS, old houses are incredibly shitty compared to modern standards. But this type of attitude slows down progress. Any sort of innovation or productivity improvement gets looked down upon as just being a way to cut corners.
As an example of what that might get you, here's one of the first search results that comes up when looking for new houses in Omiya: https://www.athome.co.jp/kodate/6971997067/. The monthly payment on this house (including land) would be JPY 95,500 (~$880 USD).
I personally bought my house used, but I can also understand why almost all of my neighbors chose to build new houses.
[1] https://www.shinseibank.com/english/housing/loan_kinri.pdf
There are also economic concerns. Most houses in the US hold some value beyond 30 years. A house build in 1990 in the US is usually still worth something but in Japan a lot of houses from that era are worth nothing. The land may be an asset still, but the structure is not.
Buildings need to be solid (actually, they are often built to jiggle around). Friends who were in Tokyo when they had that horrible Sendai earthquake, said looking out the window from the 20th floor was scary as hell, but the buildings were fine, afterwards.
That's all I've heard about.
And multi-generational households are also becoming much less common [2].
> The percentage of multigenerational households has been halved over the past two decades, dropping from 50% to 24%
[1] https://www.theguardian.com/cities/2017/nov/16/japan-reusabl...
[2] https://academic.oup.com/psychsocgerontology/article/62/5/S3...
Usually this money comes from outside sources, such as higher-level governments, but even when it is purely local, individual stakeholders may treat it as money coming from other parts of the city. In this environment, there is an incentive to demand extra scope in order to spend other people’s money on related but unnecessary priorities.
There is little reason to be efficient when spending other people’s money without their input or any long term consequences.
The incentive is to do the most work because being done early and under budget doesn't maximize $. Usually the market keeps these entities honest. Do shit work that's over budget and you lose business. But there is no market at play here, thus the govt needs to play the part of the market and penalize for this behavior but they do not. /Endrant
In Chinese/Soviet/1920s America equilibrium, with an insatiable demand for construction work, the profit maximizing behavior is to be done quickly in decent quality, then hop on to another project.
In the modern western equilibrium, where projects are few and far between, the profit maximizing behavior is to extract as much revenue as possible from any single project, employ lawyers, ask for extensions, attempt regulatory capture, create an opaque chain of subcontractors, etc. - as it's not clear whether there will be any new opportunity to do so in the future.
Zooming out a bit, this is why low growth is self-reinforcing. We need constant heavy demand to drive continual investment and productivity improvements.
I mean I'm pretty sure there is massive demand for affordable housing (especially in Manhattan!) but there's no incentive for developers to shift towards that vs bilking the everyone out of as much as possible for more "high end" construction.
The current system "works" for the people taking in the money, which they can then use to lobby the people giving the contracts to continue the current paradigm.
As with most things related to capitalist enterprises I think the solution is pulling people kicking and screaming from their beds and dragging them to the gallows during a revolution, but that feels unlikely...
I was at a "company retreat" back when I was in IT consulting. It was mostly the top salespeople for that year so I, being on the delivery side of things, found myself in a strange world. After some drinking one of the salespeople started talking about a project that went 2 months past the deadline. I asked "...and they just paid for that extra time?"
Everyone got all awkward as I realized that not only did they pay for that, they would continue to pay us to go over deadline. I was the naive one. It's just one of those topics you don't talk about.
The larger the amount of taxpayer money that is being spent the more opportunity for a larger more powerful bureaucracy to oversee the spending and more opportunity for profit by the contractor.
The same mutually beneficial waste exists at the contractor to labor unions interface (union drives up cost, more $$ for them, contractor passes on cost, more $$ for them) and at beureaucracy to politician and appointed administrator interface (bigger bureaucracy more resources go to it and more power for the administrating officials).
The only loser in the whole deal is the taxpayer who has to pay more for less.
As the proverbial wisdom goes, "to improve a dairy's profits you'd need the cows to give more milk and eat less food, so feed them less and milk more often".
Manhattan is mostly solid bedrock, for one.
Thus the time it takes to create tunnels below all the pipeworks cannot be overlooked, as it’s a very noisy endeavor.
Also, the NYC subway system is (or was, pre-covid) 24 hours, extensive, and was forward thinking.
The grates and vents you see today sidesteps the heat trapping of, say, the Tube (London).
It’s also built robustly because honestly, the riders abuse every feature.
- Bedrock is easier
- Every city has pipes. Including NYC when they did cut and cover.
- Arguably the 1930s IND started the trend of overbuilding. Being redundant with existing lines to drive out an already money-loosing bussiness isn't forward-thinking.
- The grates and vents and easier precisely because cut and cover.
- Elsewhere people abuse every feature less? More like the NYC subway is not in a state of good repair so the normal wear and tear is more visible.
- NYC is old. We still have steam pipes in active use, and it predates the subway. Also, asbestos. Nor is every city at the same scale.
- How do you quantify the amount of tax money that comes in, because the subway enables business? Home taxes are very low in NYC, because of the amount of money generated from business.
Rent is high near any station, unless it’s a completely run down neighborhood.
It also enables immigrants and students in a way that car-heavy cities can’t match. I know because I was this immigrant and student.
We don’t have the problem SF does, as less desirabke neighborhoods are affordable by teachers and nurses. - You know what vents attract? Trash. If not cleaned out it becomes a fire hazard.
- Abuse: Absolutely. DC and Boston trains are pristine by comparison, and I’ve ridden trains and railways in Japan.
New York is by far the worst, for many reasons.
It was even worse in the 70s and 80s, and the mindset never wentvaway.
- NYC is a brand new city compared to pretty much everywhere but the American West. We're talking about comparisons to Rome here, not comparisons to LA. And Rome is about 3x cheaper to build in than LA, which is about 3x cheaper than NYC. https://transitcosts.com/what-does-the-data-say/
Every problem you list exists in every other city in the world. The details are different, but the problem is there.
When Rome builds its line into the heart of the city, they dig down very deep; where it’s unlikely that any ancient artifacts will be found.
Meanwhile NYC has 7.4k miles of sewage lines and a lot of unknowns: https://www.bloomberg.com/news/features/2017-08-10/nobody-kn...
This isn’t meant to be a dick measuring contest, just that it’s a city that wasn’t really planned and so progress is painfully slow.
https://opendata.cityofnewyork.us/projects/open-sewer-atlas-...
Yes, there’s a lot of graft, turf battles, and so on but then has its own unique set of infrastructure challenges.
Then you have building collapses due to age or shoddy workmanship; not related to boring, but clearly a concern as they extend the line: https://ny.curbed.com/2015/3/26/9976560/explosion-leads-to-b...
NYC is dense and in Manhattan especially there’s no real business district vs residential.
It’s like code that is legacy and heavily used, with very powerful stakeholders. Retrofitting takes a lot of work and red tape.
That feels kinda arbitrary, what's considered a modern amenity, good Internet access? Public transport?
Having no clue what's below a city is really not that unique to NYC. If Rome can dig past it, why can't NYC?
> This isn’t meant to be a dick measuring contest, just that it’s a city that wasn’t really planned and so progress is painfully slow.
Which is, again, not unique to NYC. Urban planing as the proper academic field, we know it today, only emerged in the early 1900s.
That's not to deny that every place has its own unique challenges and issues, but that doesn't mean they are inherently unsolvable.
Building subway tunnels in such conditions is an equivalent of Olympic Games for engineers.
Btw, the tunnels aren’t the biggest cost of subway systems. Maybe 15-30%. I think the biggest tickets are usually the stations.
Honestly it's a miracle that skyscraper collapses are so rare.
NYC in particular has some very stringent regulations regarding blasting, allowable vibration levels, and so on. Long gone are the days of gung-ho cowboys lighting off fuses leading to piles of dynamite, massive fireballs, and the like.
Example reading: https://core.ac.uk/download/pdf/229071708.pdf
https://www.researchgate.net/publication/328666110_Large_str...
https://www.researchgate.net/publication/297751622_Strains_I...
https://www.researchgate.net/publication/315527348_Reducing_...
E: Trying to find a paper about blasting a road tunnel in Turkey under some ancient ruins. The stringent restrictions they were under and the things they did to maintain compliance were really, really interesting (as a blasting engineer) but I can't find the damn thing right now.
But consider that tunnels are created through mountains (far heavier). Done right, I doubt it’s an issue.
Ironically I think the city may shrink in the coming years, thanks to Covid and the upcoming fiscal crisis.
https://www.governing.com/now/taking-the-commuter-out-of-ame...
It's a regressive sop to white fighters and their posh descendents.
It simply begets more car culture, a band-aid that hides scaling limitations where they are most salient.
It's a self-defeating honey-pot that soaks up the political will for transit in something that will never get broad traction.
"Total cost overrun, largely driven by the claims settlement, three change order omnibus packages, contingency reserves and additional project management and other services, puts the final cost at $1.89 billion and sticks SFMTA with a $184 million deficit for this single project alone."
https://www.sfexaminer.com/news/major-construction-on-centra...
Speaking a somebody who lived in the area both before and after the demolition (not a property owner), the whole place is just so much more beautiful. Some commuters may have lost a view, but what they lost pedestrians all over the area gained. Even outside of the waterfront itself, the view from the street level in the adjoining neighborhoods is gorgeous now.
It could have been replaced with a much cheaper and safer viaduct, instead of a tunnel boondoggle that was way too expensive.
So then they actually built it and if you can actually imagine this it turned out to be so expensive it didn't necessarily make sense. But instead of referring to the hundred or so years of detailed documentation of this problem neophyte analysts descend and make what they think is a detailed comparison of costs when in fact they should have been examining the many complications faced by this extremely complex project. Ultimately this analysis is drug down by the weight of their failure to comprehend the Second Avenue subway alone because of the huge scale of that project and the complications that it faced.
This is like looking at per seat construction costs of the Airbus 380 and deciding that something strange must have gone on to make it cost more per seat than a basic small scale commuter aircraft.
Waste and overrun are not problems, they are the whole point of the endeavor. It is the opportunity to direct those into chosen pockets that motivates the stakeholders. The project itself amounts to legal cover, similarly to real estate now used for international money laundering. It looks like a real project, and something comes out at the end, but the majority of the money moved is just dollars shuffled from public purse to private.
It's all legal, so no risk of indictments. The US is the world leader in legalized corruption.
I'm also wondering about technological differences. Can stations be constructed in a more modular fashion, can innovation occur to allow cheaper builds? And what about using more advanced tech in boring machines, like what TBC is trying in Vegas?
Lastly, do we think a lot of stations is truly optimal? I don't know trains well, but if we get a fleet of SDCs in 20 years, maybe these can reduce station numbers by shuttling passengers their last mile or two, rather than building out billions of extra dollars of stations?
So more than double?
9. Institutions part 3: global incuriosity
The eight above factors all explain why American infrastructure costs are higher than in the rest of the world, and also explain high costs in some other countries, especially Canada. However, one question remains: how come Americans aren’t doing anything about it? The answer, I believe, has to do with American incuriosity.
Incuriosity is not merely ignorance. Ignorance is a universal trait, people just differ in what they are ignorant about. But Americans are unique in not caring to learn from other countries even when those countries do things better. American liberals spent the second Bush administration talking about how health care worked better in most other developed countries, but displayed no interest in how they could implement universal health care so that the US could have what everyone else had, even when some of these countries, namely France and Israel, had only enacted reforms recently and had a population of mostly privately-insured workers. In contrast, they reinvented the wheel domestically, coming up with the basic details of Obamacare relying on the work on domestic thinktanks alone. The same indifference to global best practices occurs in education, housing policy, and other matters even among wonks who believe the US to be behind.
This is not merely a problem in public policy. In the private sector, the same problem doomed the American auto industry. American automakers have refused to adopt the practices of Japanese and German competitors even after the latter produced small cars better suited for post-1973 oil prices. They instead dug in, demanded and got government protection, and have been in effect wards of the American federal government for about 40 years.
The Right would never allow that.
> In contrast, they reinvented the wheel domestically, coming up with the basic details of Obamacare relying on the work on domestic thinktanks alone.
Obamacare is based on Romneycare, Massachusetts's health care reform under Mitt Romney (R)'s governorship.
Going from expensive to ridiculously cheap in construction methods will only mean shaving $100k-$150k from a $1m home.
Going for extra-cheap interiors will probably save more for house in such price range.
The real solution is to rehouse America in highrise appartments.
This way, you can get up 100 fold land price reduction.
Foundation work is not going anywhere on any construction method except for smallest homes.
Framework work is probably easiest to eliminate, but you will still have to count one most basic.
Even if you have 4 fold work hours reduction, and 2-3 fold in materials you save $300k on a $1m home, and end up with a very basic house.
Apartments are better than trying to improve upon a single family home.
I'm guessing it's something to do with the US dollar being overvalued.
1. Engineering part 1: station construction methods
2. Engineering part 2: mezzanines
3. Management part 1: procurement
4. Management part 2: conflict resolution
5. Management part 3: project management
6. Management part 4: agency turf battles
7. Institutions part 1: political lading with irrelevant priorities
8. Institutions part 2: political incentives
9. Institutions part 3: global incuriosity
The bigger reasons are: a) US unwillingness to learn best practices from other countries about how to keep costs of construction down, especially for public transit infrastructure. b) US builds much bigger + fancier stations for the trains compared to other countries, which drives up cost c) US procurement is done based on cost alone, which leads to frequent cost overruns and delays. d) a lack of internal managerial competence and instead relying frequently on costly external consultants e) bad political incentives
The reliance on external "consultants" seems like a cabal, much like the ones you find in the Pakistani army. How rampant is corruption in the states?
The only thing that’s starting to change is that far-left parties are having some success at the local level. My city has multiple city council members who ran under a socialist party, which would have been completely unheard of 10 years ago.
In other times and places that may not have been the case but right now, the far left is noticeably less corrupt than the center or the right.
The problem is there are useful consultants, and consultants that charge you a lot of money for things that you want but don't really need. You need to reign in the later, or decide that they are worth spending on - your choice. I personally would prefer a small utilitarian station, but maybe you think the most expensive stations in the world are worth the cost.
We know very well that there are orders of magnitude more bureaucratic obstacles, as well as dramatically higher labor costs, when comparing any building project conducted in Texas vs. California. New York City's municipal projects are widely-known to have dramatically inflated labor costs due to various factors, not limited to rampant corruption within unionized labor. I'm a supporter of labor unions, but a minority of unions give the majority a bad name by allowing themselves to be used as tools to enrich corrupt officials. European unions seem to be far, far less susceptible to these kinds of grifters.
There are certainly issues at the federal level as well with metrics for funding allocation, but let's not pretend that building large infrastructure in states with lower regulations is remotely as expensive as in places like California which have ridiculous levels of red tape and NIMBY empowerment. (Understood that construction in California has to take into account earthquake mitigation, but it isn't remotely enough to explain the cost deltas.)
Please read the actual link. This simply isn't an issue the way you think it is. "It's the unions" is simply being intellectually lazy because it fits your preconceived notions.
"I am not overlooking union power, I believe it is not an important factor, not when right-to-work US states have very high construction costs too while Scandinavia has low costs."
The problem is the quantity of labor. In the US we use many more people to operate a TBM vs what they'd use in Europe. On commuter rail lines we pay conductors $100k a year to collect tickets when in Europe they'd use a ticket machine. On the NYC subway they have a driver and a conductor when in Europe they'd only have a driver at best, or even some lines are being made driverless I believe. They're trying that in NYC too but it's complicated and costly because of how old the signaling system is, because it was too costly to ever upgrade.
The agencies should focus less during union negotiations on keeping salaries and benefits down and more on reducing the quantity of required workers. If they were able to do it in Europe, they can certainly do it here.
But having done work in the past to do detailed analysis for the WMATA (they run the DC metro system) on various understaffing issues, the unions do contribute to issues with operations and maintenance. I will not and cannot comment on their issues with construction of the Silver Line.
But as far as maintenance, the unions (they do the same for BART by the way) constrain hiring the proper number of maintenance techs, so that the employed techs get large quantities of overtime pay. A single person working 12 hours a day ends up costing the same as two people working 8 hour days, but is definitely not going to be able to keep up with repairs, resulting in the constant broken escalators and elevators and out of commission tracks that have plagued WMATA increasingly since the late 2000's.
Reducing the quantity of workers when negotiating with an entrenched union is very, very difficult to do. They tend to want to keep the same quantity, or very slowly increase the quantity. This is very well documented behavior that is covered extensively in the book "The Machine That Changed the World", which was the first book documenting Toyota's journey with LEAN manufacturing, and then talking about the challenges GM faced with their unions when trying to implement these same practices.
All that being said, you were correct to poke holes in my statement and you added to the conversation significantly, so thank you for that.
As soon as you said "WMATA" I was going to ask about the Silver line. From the outside it certainly looked like it had problems, though I suppose tunnel boring wasn't one of them.
The NYTimes did a detailed article on this a couple years ago, with a focus on the NY subway expansion: https://www.nytimes.com/2017/12/28/nyregion/new-york-subway-.... There's no escaping that the overstaffing was a political boon to a union.
_Why_ NY construction unions are so much worse than Scandinavian unions is a whole different question. But it's not really deniable that the public-union interaction in big cities here is incredibly extractive and antagonistic, and that drives up costs.
This is something I don’t really understand about American business. In my experience it’s pretty common in America to have “superfluous” jobs - the Walmart greeter for example, valet parking attendants etc. etc.
Now on the one hand you can say these roles aren’t superfluous at all, they’re required, maybe some people find a valet convenient (does not compute for me), maybe some customers spend more in your store after a cheery hello at the entrance.
On the other hand, society works just fine without these roles and at lower overall cost.
Is it a workaround for capitalism’s failings? Like “hey of course there’s a job for everyone who wants one” kind of thing and we’ll just quietly eat the cost because the flaking out on society payments (taxes to cover rule of law etc.) is cheaper overall than having a couple of extra minimum wages on the balance sheet?
In the long-term, minimum wage hikes tend to not at all reduce employment, even when implemented in clumsy fashion like the US tends to do.
It's a shame that conversations on these things are so politicized, because it immediately prevents nuanced discussions because ideologues pounce and label you an opponent if you try to discuss realistic details.
the walmart greeter is an odd exception. why do they pay someone to stand at the door and say hello but have almost no one out on the floor to help me find things I want to buy?
Hold on, commuter and metro rail in the US have dedicated conductors? As in one per train, rather than someone spot-checking tickets on one in a hundred trains?
And the contractors pass on the cost because the bigger the final dollar amount the more opportunity there is to squeeze in profit.
And the beurcrats rubber stamp it because the bigger the amount of resources they control the more powerful they are.
And the politicans ignore it because it provides them more power to do favors and a bigger haystack in which to bury their nepotism and unethical meddling.
It's self serving waste all the way down.
The fundamental problem is that nobody anywhere in the chain or responsibility wants to spend taxpayer money with precision, efficiency and care because doing otherwise is in their best interest, as is every other party, except the taxpayer who has no choice but to bend over and take it.
It's not just a union problem. But rest assured the unions are doing all they can to perpetuate it as it benefits them.
This is not how most unions in the United States operate but they do operate this way in locations where the dominant political party has not changed for a hundred years, see NYC.
It's rather condescending to indicate to someone that they don't understand what a union is. You should research a little bit more before you assume that unions aren't able to influence private companies that employ them when negotiating contracts with local governments. It's simply wrong.
I'm very familiar with these details because I had to do a detailed analysis of labor costs for the WMATA which has to negotiate with unions to operate the DC metro system.
New York and California have plenty of roads.
That's a nice resiliency and I give roads credit where they are due for it. But cars are terrible and we simple cannot continue to do the easy status quo thing.
If the suburbs are different, this is a decent point. But the major American cities and their suburbs are a majority of the country on every metric that matters. BOS-WASH + SoCal alone is more than 20%.