Why do they need to put these containers together? Why not create a 30 MW box and drop it in suburbia?
Also, a project designed to export 1GW can connect to a regional or national grid. Then it can sell power far more widely. Connected to a local grid you have the same capacity issues as solar. Why bother?
For refueling you disconnect the pipes and cables, place it on the railcar, and send it to manufacturer.
Initial design for such cell was 150MW(e) each, thus the name.