And just imagine how badass the canal would look if we glassed the banks and lined them with some LEDs!
(please don't do this)
And all you have to remove it is a pin. So, this is going to take a while.
Or is this a problem that money alone can't solve?
The load has been very carefully placed on the ship to ensure maximum stability. So the heavy loads are probably deeper in the hull and the lighter loads are higher up. When ships get unloaded in port, it's unlikely that all the containers are for that port, so an intricate dance starts - offloading some containers, moving other ones to maintain the balance, and loading new ones. At all times, you have to keep the load within tolerances so that your ship doesn't go "I'm out!" and roll over.
So yeah, money alone can't solve this in 24 hours. They've got to calculate the load changes when they offload containers, so that you don't accidentally cause the ship to roll over in the canal. You're not going to stop that happening with a few bits of rope tied to some concrete pillars in the ground..
[0] https://www.vesselfinder.com/vessels/EVER-GIVEN-IMO-9811000-...
[1] https://www.dsv.com/en/our-solutions/modes-of-transport/sea-...
Is it common at all to get containers off a ship outside of docking areas?
The modern shipping world is all about containers, container cranes, and container ships. 99 Percent Invisible hosted some episodes of the Containers podcast [0] that will probably provide some insight.
0: https://99percentinvisible.org/episode/containers-ships-tugs...
https://en.wikipedia.org/wiki/Mil_Mi-26
It will take time but that thing has the capacity.
I don't think more money would make those companies work faster and I don't think there is some reasonable alternative solution available other than using these companies.
This is now an engineering and logisitics problem. What is necessary for the ship to be floating again? And what equipment is needed for that to happen? If it isn't already at hand, how can they get the equipment there (there is navigable water nearby, but there may be no way to unload heavy equipment onto the land).
So there are two fundamental challenges:
- come up with a good plan how to get the ship out of there
- transport the necessary equipment quickly to the site. This step can easily take weeks.
Question is, what would happen? Would the ship move the sand it's embedded in, realign with the deepest part of the channel and move off?
Or would the (potentially already damaged) hull breach?
I think it's just going to take time and lots of digging.
Best to take it slow and steady.
Smit will be making bank on this.
Considering it earns $10B/year to Egypt, I don't know if this short downtime will justify the cost to them.
A quarter mile diversion can't take that long to dig. The whole canal is 120 miles, so an extra quarter mile they should be able to dig in a few days I would think?
- launch minecraft in creative mode and make 40x40 pad of steel blocks, 1 block high. You should do it in a few minutes.
- now do a 40x40x40 cube. Good luck for the rest of your day.
If you had to estimate the volume of earth in that 'quarter mile', and then estimate the size of an excavator bucket, and the capacity of a dump truck, and the availability of all those things at any given time (even if you ship them in), you'd soon realize that just digging out that earth will take more time.
On top of that, there's going to be FLOW in the canal - what will your diversion to for erosion, pressure on the locks, etc.
You risk damaging the canal itself to deal with a temporary problem if you think you can just 'dig around it' in 5 days. My bet is you've never seen how long it takes to plan something with this much risk involved.
This isn't software, you aren't going to Agile it away if you screw it up.
(If you think it's that easy, pop over and ask if you can have a go on the JCB)
Uh, what? Why would the length of the canal as a whole tell you anything about how long digging a quarter-mile section would take? If the canal as a whole was longer or shorter, would that somehow change your estimate?
Once-per-century investment for France. It was, like the Eurotunnel, nominally privately funded: https://en.wikipedia.org/wiki/Suez_Canal_Company but with significant political cover.
Many bulk carriers exceed Suezmax limits and can't go trough.