That's an interesting research problem to work on the next decades. By the time that happens or not, there won't be any coal plants remaining and most gas will be on the way out as well (considering that is already barely competitive today).
That's an interesting research problem to work on the next decades. By the time that happens or not, there won't be any coal plants remaining and most gas will be on the way out as well (considering that is already barely competitive today).
E.g. the Australians vastly reduced their need for gas plants just by installing a few hundred MW of battery and saved a lot of cash in the process. ROI on those batteries has been quite high very early on. Not having turn on their peaker plants is a big deal.
The Chinese hedged their bets a few decades ago and wind + solar won there as well. China is breaking records in terms of growth of their renewable capacity and are a key technology supplier in that space and also a big part of why it got so cheap.
Even though I'm generally pro nuclear, I've come to the conclusion that absent some innovation that changes the cost structure, it's an increasingly dead option. I was hopeful NuScale's approach would do that, but it's pretty clear now they're missing their needed numbers.
Nuclear is also eye-poppingly expensive to decommission.
Finally, note that operating cost doesn't include the sort of re-engineering and upgrades that are routinely required, and have doomed plants like San Onofre.
On the other hand, estimates of wind and solar do not include the cost of storage to actually make intermittent sources viable. Which is understandable, because there's really no plan to provision this much storage without a massive breakthrough in storage solutions. Almost all plans for a predominantly wind and solar grid assume that something like hydrogen, synthetic natural gas, or something else will provide massive amounts of cheap storage. Until then, it's fossil fuels to fulfill off-peak demand.
The problem with renewables (for nuclear) is that it reduces the potential revenue for a nuclear plant over its 6-7 decade lifespan to well below any level where it makes sense to build them. If you budget for 1960s era grid pricing it all looks beautiful. Then fast forward 6 decades and you have solar bids trending towards 0.01$/kwh when most nuclear plants in operation are basically closer to 0.15$/kwh.
That's the whole problem. It's the most expensive option in the market by far. a 10X improvement would make it competitive with current solutions. Except that will take a few decades. So, realistically, you'd need a second order of magnitude improvement at that point. Yes, I believe renewables can do another 10x cost reduction over the next decades; possibly more. Ballpark 0.005$/kwh is probably worth investing in for a plant that comes online around 2045 or so. That's a modest 3x cheaper than the lowest solar/wind bids right now. 25 years is a long time. In any case, last time I checked, such plants are not being planned anywhere and most nuclear bids are 10x or more expensive than that. Out of the gate they are 2-3x more expensive than solutions in the market right now. That's for a plant that has not been built yet and will take decades to get built.
Long term storage isn't too bad of an issue either, but there's two camps. One is to do smaller sites where we can just bury local material in the ground. The other is having a large mass site (think Yucca Mountain), which means higher scrutiny because there's more chances of something going wrong (standard failure analysis) and you're packing more material together which increases total radiation levels. Either one will work, but both are bureaucratic nightmares. The result of which has been constantly changing plans, which drives up costs very quickly as you change gears (e.g. spend tons to survey the US for good sites, more to verify Yucca Mountain is good, start digging, cancel because NIMBY, start again, cancel, survey other areas, repeat).
But one factor I want to mention is that by the nature of the physical processes materials can't be both extremely dangerous and long living. The danger literally comes from mass being expelled from the atoms. High level radioactive materials have and always will be stored on site, as this is the safest place for them (where they can be monitored).
There are still technical challenges, don't get me wrong, but the whole process is also a bureaucratic nightmare on top of that and we know what that does to costs.
For some better facts I'll refer you to an article written by a HN user that is a reactor scientist: https://whatisnuclear.com/waste.html
The cost of storing waste is minuscule in comparison to the amount of electricity generated. Europe's waste repository in Finland costs ~800 million Euros [2]. Which is an order of magnitude less than a nuclear plant. And the repository can accommodate the fuel produced by several plants.
In short, waste disposal accounts for a single-digit percentage of nuclear power operating costs.
1. https://www.energy.gov/ne/articles/5-fast-facts-about-spent-...
2. https://en.wikipedia.org/wiki/Onkalo_spent_nuclear_fuel_repo...
Decommissioning adds $0.80 per MWh of electricity generated, assuming a capacity factor of 90% and a lifetime of 80 years. By comparison, the cost of natural gas power is $40 to $80 per MWh.
You and I seem to have very different ideas of what is a "staggering" cost.
1.https://www.world-nuclear.org/information-library/nuclear-fu....
Decommission costs are low... when planned. When a project at scale starts, however, things are usually less fun. Take a look at the UK. The UK discounted provision for decommission costs: £100+ billion in 2013 https://www.theguardian.com/environment/2013/jun/23/britain-...
£161 billion in 2017 https://web.archive.org/web/20170516093449/https://www.gov.u...
£234 billion in 2018. Costs were so quickly exploding there is a new way to forecast, which dissimulates... err... is more... well... https://www.gov.uk/government/publications/nuclear-provision...
https://www.theguardian.com/environment/2020/nov/27/uks-nucl...
Decommissioning small and old reactors costs more, and entombing may, at least apparently (short-term), reduce the cost. In theory. Let's check a real and ongoing case: Oyster Creek. According to the EIA its construction costs were $488 million (2007 USD) ( https://www.eia.gov/nuclear/state/archive/2010/newjersey/ ). As soon as the decommission project started the Nuclear Regulatory Commission announced that it will cost "about $1.4 billion to shut down the plant". Not for an immediate and complete decommission, because the plant will stay in a “safe store” condition until 2075, with dismantling ((...)) set for a period between 2075 and 2078 ( https://www.powermag.com/oldest-u-s-nuclear-plant-shuts-down... ). Then new problems (costs!) may arise. Let's bet that, as usual, the taxpayer will pay and the real cost will be hidden.
US: https://cleantechnica.com/2020/12/01/us-nuclear-site-cleanup...
Moreover if there is a serious glitch during decommission or at a waste repository site, are bets are off. You can obtain an insurance policy for anything, AFAIK even for a space trip, but no-one covers major nuke risk (reimbursements have a hard limit).
Back here in reality, there are several operating nuclear waste facilities: https://en.wikipedia.org/wiki/Deep_geological_repository#Nuc...
> £161 billion in 2017 https://web.archive.org/web/20170516093449/https://www.gov.u...
> £234 billion in 2018. Costs were so quickly exploding there is a new way to forecast, which dissimulates... err... is more... well... https://www.gov.uk/government/publications/nuclear-provision...
Do you realize that these figures include cleanup from nuclear weapons development?
> Decommissioning small and old reactors costs more, and entombing may, at least apparently (short-term), reduce the cost. In theory. Let's check a real and ongoing case: Oyster Creek. According to the EIA its construction costs were $488 million (2007 USD) ( https://www.eia.gov/nuclear/state/archive/2010/newjersey/ ). As soon as the decommission project started the Nuclear Regulatory Commission announced that it will cost "about $1.4 billion to shut down the plant". Not for an immediate and complete decommission, because the plant will stay in a “safe store” condition until 2075, with dismantling ((...)) set for a period between 2075 and 2078 ( https://www.powermag.com/oldest-u-s-nuclear-plant-shuts-down... ). Then new problems (costs!) may arise. Let's bet that, as usual, the taxpayer will pay and the real cost will be hidden. US: https://cleantechnica.com/2020/12/01/us-nuclear-site-cleanup...
Even if the pessimistic figures pan out and the existing nuclear fleet costs $70 billion to clean up, that's still within the $.4B to $.7B per GW range I provided.
22 sites.
Theoretically "actives" ones are:
- Olkiluoto which is in fact Onkalo (see https://en.wikipedia.org/wiki/Olkiluoto_Nuclear_Power_Plant#... ) which is "expected to be operational in 2023." (see https://en.wikipedia.org/wiki/Onkalo_spent_nuclear_fuel_repo... )
- Loviisa which is AFAIK a site dedicated to the local reactors(?), and only for "low- and intermediate-level operational wastes". Onkalo is the planned site, and is NOT active ( see https://www.world-nuclear.org/information-library/country-pr... )
- Wolseon (Korea) is for Low and Intermediate Level waste only (see https://en.wikipedia.org/wiki/Wolseong_Low_and_Intermediate_... ). Its total capacity (800k drums) is far away, as for now it only contains 100k drums (see https://www.korad.or.kr/korad-eng/html.do?menu_idx=37 )
- the "Waste Isolation Pilot Plant" (New Mexico) is, well, a "Pilot Plant" (doesn't come as a surprise). Moreover "The waste is from the research and production of United States nuclear weapons only", and only for 10k years. (See https://en.wikipedia.org/wiki/Waste_Isolation_Pilot_Plant ). In some dream one may deposit powerplant waste there, however back in reality...
"Back here in reality" (uh, uh) there is no active site in any huge nation which nuke-produces power for decades (US, France, Germany, Japan...) It will become more and more difficult for the public to believe that all this is perfectly managed, back here in reality.
> Do you realize that these figures include cleanup from nuclear weapons development?
Do you realize that the civil and military were so intimately tied during those phases that no one (even, in France, the supreme public finance audit authority, namely la 'Cour des comptes') can untangle the mess?
> Even if the pessimistic figures pan out
The UK had less than 20 nuclear powerplants and upon starting serious decommission they think that decommission costs will amount to at least £234b Even if (at best) only ~1/3 (?) will be necessary for purely civil reactors and sites that's ~£78b (~110bUSD)
The US have 58 active nuclear power plants (96 reactors) (see https://www.eia.gov/energyexplained/nuclear/nuclear-power-pl... ), approximately 3 times more.
If this repository is planed for 100 000 years (in germany it's 1 mio years) that are 8000€ a year. That doesn't sound like a realistic number to me. And it's by no way europes waste repository, it's for the 2 finnish nuclear plants.