> the project needed to be (almost) re-created from scratch
> the build system, Docker/docker-compose, continuous integration, authentication, internationalization, etc
> created a wiki, migrated the code to a monorepo, created/cleaned up the backlog, etc.
> created a story map, devised a roadmap, and clarified the scope of the MVP
> replaced Angular Material by Tailwind, created our own theme, refactored the data model
This is why. A year went by and no product work was done, none of this was necessary. The very first thing that should have been built is a MVP, that main screen that was only tackled 9 months in. Strongly recommend studying “The Lean Startup” and learning how to be stoic about tech. That’s how people deliver working products in three months.