Also consider this:
> On the Eysturoy side of the tunnel house prices increased by 31% between 2019 and 2020 and have doubled between 2015-2020 [0]
Additionally, the tunnels are tolled [0]:
> Construction costs for the tunnel are being recouped through toll fees. Tolls start at 75 DKK for small cars (up to 3,500 kilograms (7,700 lb)) between Tórshavn and Eysturoy, and 25 DKK for local traffic between Saltnes (near Runavík) and Strendur. This price is for people who have a subscription (hald). Without subscription the price is 175 DKK between Eysturoy to Streymoy and 125 DKK between the two arms of Skálafjørður.
75 DKK are around 10 EUR. With an estimated 6,000 cars per day, thats 60,000 EUR per day. At this rate, the tunnel will have paid for itself (if maintenance cost is excluded) after 8 years.
17M/km - that is the key. It is couple orders of magnitude cheaper than in some other places. Or compare to just road, not tunnel, building:
https://www.rbth.com/articles/2010/10/20/what_drives_russias....
"However, the Russian costs of road building are among the highest in Europe, with each mile of road costing $10.5 million."
and the 20km Crimean Bridge cost almost $4B. If they tried tunnel instead of bridge, i suppose that would have added another order of magnitude :)
This is somewhere in between I think.
Those tunnels cut travel time to the capital from 1h14 to 16 min. Moreover, you don't have to travel by car+ferry+car, you simply drive.
I reckon the increased accessibility makes it worth them in one year.
If you only want to count in monetary terms, consider that a hospital in the capital is suddenly reachable in 16 min instead of over 1hr. So they don't need helicopters for emergencies; they don't need minor, unsustainable hospitals on the other island just to have healthcare accessible, etc. Same for other things: supplying the 2nd islands can be done by lorry from the first, instead of shipping. Et cetera, et cetera, et cetera.