IMO baseline being nuclear and the rest being mostly renewables (With HEAVY reliance on pumped storage power plants, as a sort of capacitor) is the way to go to minimize emissions.
IMO baseline being nuclear and the rest being mostly renewables (With HEAVY reliance on pumped storage power plants, as a sort of capacitor) is the way to go to minimize emissions.
You're correct, that there is not a 1:1 reduction in fossil capacity through the construction of renewable capacity. But the fossil capacity is used less, as the marginal cost of the renewable energy is near zero.
Most pumped hydro today (at least in the US) was built during the nuclear build-out because nuclear can't easily be "load following." So, we had to build out additional infrastructure with low capacity factor.
IMO, tax emissions, let the free market figure it out.
Sadly we never got that nuclear power plant.
Also, there is no corruption around storing waste because we aren't storing waste yet anywhere outside nuclear facilities which are supervised by the government and the IAEA.
IAEA failed in Iran due to political posturing from europe. Europe has broken more than a few core international organizations. I'd rather not trust them to not cover up anything else for europe.
[1] https://cna.ca/news/germany-replaces-nuclear-coal-ghgs-skyro...
Except they are not. Otherwise Germany wouldn't be one of the dirtiest electricity producers in Europe.
I don't know why EE supporters keep ignoring the fact that any electricity not produced by wind and solar despite being needed will be produced by gas or coal which is why Germany is massively investing into new gas plants and a second gas pipeline to Russia (Nordstream 2).
You cannot solely rely on wind or solar which are intermittent and have a low energy density.
The downside is with no grid power the solar system doesn’t work to power the house. There are systems that can but they’re more money.
Obviously it's not quite that easy, for example an oven uses resistive heating elements which would work fine on DC, however, the relay in the control circuitry wouldn't be able to switch a DC voltage.
Nuclear and pumped storage takes a very long time to build. The other storage systems are starting to make inroads - tiny ones so far, but growing rapidly. The "fast frequency response" market provides them economic support.
It does not work fine at all. Germany is one of the dirtiest electricity producers in Europe.
France emits 50 grams of CO2 per produced kilowatthour while Germany produces 400 grams on average:
> https://www.electricitymap.org
Germany also has the highest electrity prices in Europe:
> https://ec.europa.eu/eurostat/statistics-explained/index.php...
NASA also disagrees that gas plants are a good solution:
There is a reason why the UK is building or planning new nuclear power plants in Hinkley Point, Sizewell and Bredwell.
https://www.abc.net.au/news/science/2017-10-12/renewable-ene...
"Technology has moved on from base load, and now you want flexible power. And that's what demand management, batteries and pumped hydro is," says Professor Andrew Blakers, director of the ANU Centre for Sustainable Energy Systems.
"If you have an increase in demand, a coal power station will take hours [to meet it], a gas turbine 20 to 30 minutes, batteries about a second, demand management about a second, and pumped hydro will take anywhere between 20 seconds and two minutes."
You can not guarantee, no matter the capacity of power storage, that you never produce too little power over a long enough period.
This is the basis of my opinion that the closer to 100% renewable you get the faster the amount of additional capacity you need rises.
Something like 1/x over-provisioning[1] needed, where x is the percentage of environmentally independent power sources.
[1] Not sure if that is the right word.
Put another way, it's probably more likely that they'll be some sort of equipment malfunction than we go an entire month with no wind.
Providing redundancy through independent mechanism (over-provisioning, storage, diverse sources) helps a lot.
But you're right. A grid that's 99% renewable with a natural gas peaker providing that last 1% will be a lot cheaper than a grid that's 100% renewable.
You are right in that there is no such thing as "baseline" generation really. And thermal plants also need to be over-provisioned.
There is dispatchable and non dispatchable power, the former being plants that can alter output on demand.
Base-load is the point which the 24 hour cycle of demand doesn't go below. It's pretty much just a number.
Who occupies the base of the generation stack and will stay running during low demand, is the one who is cheapest. If wind is cheaper than nuclear, it will displace nuclear. The people who say "IMO we need nuclear for baseline and renewable for peaking" completely miss these facts.
The way it is going is renewable at the base of the stack and dispatchable power filling in the gaps, be that during peak or periods of low renewable output.
Very good idea to run gas plants with 490 grams CO2 per kWh instead of nuclear power plants with 12 grams CO2 per kWh, indeed.
France produces 50 grams of CO2 per kWh while Germany has 400 grams on average:
> https://www.electricitymap.org/
Your ideal model for producing electricity actually hurts the environment as the times where gas plants need to run are much more often than you think.
A 100% nuclear grid will need dispatchable peak power as well, be it gas or storage.
Go to smard.de, check "Market data visuals" and "Electricity consumption->Actual consumption" and you will be presented with the baseline which is never below 40 GWh in Germany at any hour.
For reference best UK offshore wind farm had 55.3% capacity factor in 2019 and UK offshore wind average capacity factor was 40.6% in 2019 (2)
(1) https://media.rte-france.com/bilan-electrique-2019-2/ 379.5 Twh produced, 63.1 GW installed, 68.7% capacity factor
(2) https://energynumbers.info/uk-offshore-wind-capacity-factors
Not far from so-called "baseload"
https://www.energylivenews.com/2015/12/15/unplanned-shutdown...
Wind is intermitent but predictable. Loosing a turbine will not make the plant production go to zero (albeit loosing transmission will but same for all power plants).
On the other hand, we have times in Germany when wind and solar are producing less than 1% of their installed power.