How can you be unprepared for the load? They would have and should have expected and tested for the load on launch day.
You'd basically be preparing for a load spike that you're unlikely to see ever again. It probably makes more sense for most systems to just take the L on day 0 and design for day 1+ instead of designing for day 0 and being overengineered for day 1+.