Zen 2 is designed for a 7nm process, which limits its production to TSMC or Samsung. There is nowhere to build AMD's newer chips in China (unlike 14nm Ryzen), stopping them from using the tariff bypass they did through this JV. This lack of bleeding edge fabs in China is unlikely to change soon.