The electrician's time is the most expensive part; oversize for decisions such as these (load center, EV run to outlet, subpanels, etc).
The electrician's time is the most expensive part; oversize for decisions such as these (load center, EV run to outlet, subpanels, etc).
The caveat is that your system must charge the battery from your panels, and cannot charge from the utility (trivial inverter setting). With that said, based on net metering laws in most locales, it behooves you to consume as much of your own production as possible. Exceptions abound.
https://www.reddit.com/r/energy/comments/82fchy/irs_letter_o...
However, when more and more people try to have fast chargers in their homes for EVs, then not only the residential installation poses a problem, but utilities would need to rebuild ~two layers of distribution to accomodate for a 100-200 % increase in residential power consumption.
[1] Not just because high currents are more difficult to handle properly, but also because you need a lot less copper.
Hell if the PowerWall 3 could dump 40 amps you could pull 20 from the wall at the same time and hit your 60 amp total.