On the country side, laying cables for 1MW peak load (4 superchargers @ 250 kW) will be expensive - the grid in rural areas is enough for some farms and small villages, that's it.
In cities, electric-car chargers will have to deal with political obstacles (no one wants to sacrifice free-for-all parking spots!), in addition to the electricity problem - while in a city there might be more available 10+ kV lines (you don't want to do 250 kW over 230V AC, it's over 1k A current!), sidewalks are often enough very slim as it is and it will be difficult to get a charging station installed there, and digging in earth filled with cables is not exactly fun either (been there, done that, it's manual work of the worst kind as you can't even use a proper showel...). Getting chargers in garages will face obstacles of the HOAs, plus the house uplinks usually are without much reserves - my 12-apartment house, for example, is linked to the grid on 3x63A with each apartment (~60 m2) being fed by a single 40A phase. Not much, certainly not enough to feed even two electric cars in the backyard.
Either way you'l have to rebuild the entire grid more sooner than later if electric cars should have a future... there's not enough money to rebuild Detroit's water, where should the money for a full scale grid rebuild come from? It's all decades old infrastructure, no matter if in the US or Germany. Replacing or significantly upgrading it means billions to trillions of dollars.